PLM99-04011
| Plumbing Rough-in | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | PASS |
|
|
###-#### R/I ok.
|
PLM99-04019
| Sprinkler (Final) | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | PASS |
|
|
JOSE ###-#### REINSPECTION Final ok.
|
PLM99-04032
| Groundwork | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
KEITH ###-#### G/W ok.
|
PLM99-04034
| Plumbing Rough-in | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
craig ###-#### basic 9 fixtures R/I ok.
|
PLM99-04035
| Plumbing Rough-in | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | FAIL |
|
|
tim ###-#### Water system test failed.
|
PLM99-04031
| Plumbing Rough-in | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 08:56:41. Contact: ###-####. R/I ok.
|
PLM99-04041
| Water and/or Sewer | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
keith ###-#### S/W final ok.
|
PLM99-03986
| Final | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
Interceptor piping and unapproved material inside perimeter of the building ok. Final ok.
|