ELE98-03567
| Electrical Rough-In | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 08:38:52. Contact: ###-####. 1st floor entry wall; 4th floor O.R. rooms walls R/I.
|
ELE99-04063
| Permanent Service | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 12:18:30. Contact: ###-####. Ufer ground required at dwelling.
|
ELE99-01663
| Final | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | PART |
|
|
BRADLEY ###-#### Temporary occupancy.
|
ELE99-03702
| Electrical Rough-In | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | FAIL |
|
|
late am John ###-#### Not ready; contractor will reschedule.
|
ELE99-03430
| Final | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/03/1999 at 07:03:15. Contact: ###-####. Job completed.
|
ELE98-04106
| Final | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | CANC |
|
|
Inspected by insp. #412 and passed on 12/2/99.
|
ELE99-04209
| Rough-In Permanent Service | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PART |
|
|
Glenn ###-#### Main switch gear/meter.
|
ELE99-04211
| Final | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
###-#### Modular cubical dividers connection.
|
ELE99-03702
| Electrical Rough-In | 12/3/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PART |
|
|
will be on somebody on site Suites #408 & #409 Ele. R/I.
|
ELE99-03888
| Electrical Rough-In | 12/2/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PART |
|
|
AROUND 1:00 IF POSSIBLE TYLER ###-#### PRAMACY Pharmacy walls R/I.
|
ELE99-01068
| Electrical Rough-In | 12/1/1999 | 12/3/1999 | 12/3/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/01/1999 at 13:15:07. Contact: ###-####. before 3:00 Ele. R/I.
|