Inspections for the day of: Monday, December 3, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-02548 BLD-Framing/Rough-in11/30/200112/3/200112/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/30/2001 at 07:45:27. Contact: ###-####. Shear OK. 12/3/2001 10:09:25 AM
BLD01-02320 BLD-Wall cover11/30/200112/3/200112/3/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/30/2001 at 08:47:40. Contact: ###-####. No plans Etc 12/3/2001 10:32:43 AM
BLD01-02320 BLD-Framing/Rough-in11/30/200112/3/200112/3/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 11/30/2001 at 08:48:20. Contact: ###-####. No Eng. 12/3/2001 10:33:27 AM
BLD01-01624 BLD-Conference11/30/200112/3/200112/3/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 11/30/2001 at 14:36:43. Contact: ###-####.
BLD01-01762 BLD-Final11/30/200112/3/200112/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/30/2001 at 16:25:57. Contact: ###-####. C/C issued. 12/3/2001 9:25:51 AM
BLD01-03037 BLD-Footing12/3/200112/3/200112/3/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/03/2001 at 07:36:01. Contact: ###-####.
BLD01-01762 BLD-Final12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/03/2001 at 08:49:43. Contact: ###-####. Previously passed by 316 12/3/2001 4:17:58 PM. 12/3/2001 4:18:32 PM
MEC01-03591 Final12/3/200112/3/200112/3/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/03/2001 at 10:42:54. Contact: ###-####. Should be P/T insp......P/T....OK. 12/3/2001 4:14:28 PM