Inspections for the day of: Monday, December 3, 2001.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorStan Johnson
TitlePLM-INSPECTOR
Phone #340-1257
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01921 Final11/29/200112/3/200112/3/2001 12:00:00 AMAFAIL
###-#### ext 204\\stan will you check on this for additional fixtures this permit only has a sewer line and he says you did the rough in and now he wants the final???? I didn't do a rough in he stubed sewer into building so he could rough in later decided to rough it i9n now and leave finish till later will buy permits for future fixtures on 10-04-01 he told me looked at water test ok 12/3/2001 2:18:13 PM
PLM01-04018 Plumbing Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/03/2001 at 07:49:40. Contact: ###-####.drain test failed water ok 12/3/2001 3:05:39 PM
PLM01-03502 Final12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/03/2001 at 08:53:20. Contact: ###-####.
PLM01-03502 Final12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/03/2001 at 08:53:20. Contact: ###-####.
PLM01-03327 Final12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
NANCY ###-#### GARAGE # 3978 ENTER
PLM01-04055 Plumbing Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
###-#### TIM
PLM01-01921 Plumbing Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMPPART
Scheduled by Inspector: 352 On 12/3/2001 2:19:37 PM water test ok will buy fixture permits 1 wc 1sho 1 lav 1aundry sink 1 water heater 12/3/2001 2:22:32 PM
PLM01-03502 Final12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/03/2001 at 08:53:20. Contact: ###-####.
PLM01-03502 Final12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/03/2001 at 08:53:20. Contact: ###-####.