Inspections for the day of: Monday, December 3, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDixie Fellows
TitleMEC-COM/RES INSPECTOR
Phone #794-6208
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-03397 Final11/30/200112/3/200112/3/2001 12:00:00 AM NR
A-1 FIREPLACE ###-####
MEC01-03619 Final11/30/200112/3/200112/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/30/2001 at 16:40:28. Contact: ###-####.
MEC01-03627 Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMAPASS
per dixie
MEC01-03629 Pressure Test12/3/200112/3/200112/3/2001 12:00:00 AMAPASS
###-#### PAUL
MEC01-03570 Final11/30/200112/3/200112/3/2001 12:00:00 AMACANC
###-#### JOHN canc this as he was called into work
MEC01-03614 Rough-in11/30/200112/3/200112/3/2001 12:00:00 AMAFAIL
###-#### gas test was done by intermountain gas co....called contractor for access number..they never called me back 12/3/2001 3:30:31 PM
MEC01-03445 Rough-in11/30/200112/3/200112/3/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 11/30/2001 at 13:54:38. Contact: ###-####.
MEC01-02862 Pressure Test12/3/200112/3/200112/3/2001 12:00:00 AMPFAIL
###-#### LENNY guage pegged 12/3/2001 2:59:00 PM
MEC01-03629 Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
Added by Inspector: 411 On 12/3/2001 3:31:59 PM
MEC01-03320 Final12/3/200112/3/200112/3/2001 12:00:00 AMPFAIL
###-####
MEC01-03430 Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMPCANC
###-#### out of time 12/3/2001 3:57:26 PM
MEC01-03624 Pressure Test12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
###-#### zack
MEC01-03543 Rough-in12/3/200112/3/200112/3/2001 12:00:00 AMPNR
###-####
MEC01-03543 Pressure Test12/3/200112/3/200112/3/2001 12:00:00 AMPPASS
MEC01-03628 Pressure Test12/3/200112/3/200112/3/2001 12:00:00 AMPNR
###-#### or ###-####