Inspections for the day of: Tuesday, December 3, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01853 BLD-Conference12/2/200212/3/200212/6/2002 12:00:00 AMPNH
MIS02-00311 BLD-Final12/2/200212/3/200212/3/2002 12:00:00 AMANR
BLD01-02970 BLD-Final12/2/200212/3/200212/3/2002 12:00:00 AMANR
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie...need fire ok, complete brg wall repairs (hinge point) at unfinished area 12/3/2002 10:23:35 AM
BLD00-02242 BLD-Final12/2/200212/3/200212/3/2002 12:00:00 AMANR
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, need fire, etc. 12/3/2002 10:23:57 AM
BLD01-02970 BLD-Final12/2/200212/3/200212/3/2002 12:00:00 AMACANC
###-####
MIS02-00311 ELE-Final12/2/200212/3/200212/3/2002 12:00:00 AMACANC
Leah, ###-####
BLD02-02093 BLD-Conference12/2/200212/3/200212/3/2002 12:00:00 AMAPASS
ken, ###-####
need to determine if permit req'd for refrigeration/freezer condenser.... 12/3/2002 2:06:53 PM
BLD02-00175 BLD-Final12/2/200212/3/200212/3/2002 12:00:00 AMPPART
###-####...c/n, damper, "s"door labels at corridors...ok for t/o... 12/3/2002 4:58:46 PM
BLD02-00172 BLD-Framing/Rough-in12/3/200212/3/200212/3/2002 12:00:00 AMPPART
###-####...ok to 1side only. 12/3/2002 1:53:01 PM
BLD02-00199 BLD-Footing12/3/200212/3/200212/3/2002 12:00:00 AMPPART
###-####...wip, strata onsite...North wall ftgs. 12/3/2002 1:57:51 PM
MIS02-00311 BLD-Final12/3/200212/3/200212/3/2002 12:00:00 AMPPASS
ok for c/o 12/3/2002 4:55:25 PM
BLD02-02708 BLD-Final11/27/200212/3/200212/3/2002 12:00:00 AMPFAIL
###-####; need fire ok, verify flame spread at new wood tiles at lid or provide non-comb. backing. 12/3/2002 3:39:08 PM