Inspections for the day of: Monday, December 3, 2007.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-01553 FIRE-Final Inspection12/3/200712/3/200712/3/2007 4:40:39 PMPPASS
life safety passed
FIR07-00738 INSP-Sprinkler Rough-in/Hydro12/3/200712/3/200712/3/2007 4:37:46 PMPPASS
Overhead hydro test and rough-in inspection passed.
FIR07-00868 INSP-Sprinkler Rough-in12/3/200712/3/200712/3/2007 3:25:05 PMPPASS
permit finaled
FIR07-00860 INSP-Sprinkler Rough-in12/3/200712/3/200712/3/2007 2:45:38 PMPFAIL
Provide additional sprinkler coverage in the beam pocket as marked on the plans. Provide additional coverage below the old MRI ceiling or remove the ceiling as marked on the plans. This inspection was for only a portion of the scope of work. The sprinkler piping in this phase that is not one of the two deficiencies listed above is ok to cover.
FIR07-00701 INSP-Final Inspection12/3/200712/3/200712/3/2007 2:42:23 PMPFAIL
One sprinkler pendant is mounted too close to a new soffit that surrounds the fire door.
BLD06-03515 FIRE-Final Inspection11/30/200712/3/200712/3/2007 1:22:49 PMAPASS
Life safety passed. Mark Senteno with the Boise Fire Dept is ok with the gate width being at 19'-7"
FIR07-00825 INSP-Sprinkler Rough-in11/30/200712/3/200712/3/2007 12:43:59 PMAPART
The office sprinkler piping is ok to cover but an additional upright head needs added by the overhead door where existing coverage is blocked.
BLD07-02492 FIRE-Final Inspection11/30/200712/3/200712/3/2007 11:43:55 AMAPASS
Life safety passed
FIR07-00927 INSP-Sprinkler Rough-in11/30/200712/3/200712/3/2007 11:43:08 AMAPASS
Sprinkler piping is ok to cover