Inspections for the day of: Wednesday, December 3, 2008.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00769 Random Inspection11/26/200812/3/200812/8/2008 8:55:08 AMAPASS
ESC06-00802 Site Final12/3/200812/3/200812/3/2008 3:47:30 PMPPASS
ESC06-00790 Site Final12/3/200812/3/200812/3/2008 3:47:19 PMPPASS
ESC06-01063 Site Final12/3/200812/3/200812/3/2008 3:47:09 PMPPASS
ESC07-00474 Site Final12/3/200812/3/200812/3/2008 3:41:16 PMPPASS
ESC07-00813 Site Final12/3/200812/3/200812/3/2008 3:40:52 PMPPASS
ESC05-00664 Site Final12/3/200812/3/200812/3/2008 3:40:20 PMPPASS
ESC08-00223 Random Inspection12/3/200812/3/200812/3/2008 3:04:15 PMPPASS
ESC08-00365 Site Preparation12/3/200812/3/200812/3/2008 3:03:01 PMPPART
Told RP to have the parking lot cleaned by 12/5/08 PM.
ESC07-01278 General Inspection12/3/200812/3/200812/3/2008 2:34:45 PMPFAIL
Told RP to protect the storm drains within the project. He asked if just filter fabric will be ok due to the completing of all of the interior and exterior will be completed by 12/13/08. I gave him the ok for that time frame. If it extends pass 1213/08, he will be required to use proper inlet protection. Will re-inspect on 12/5/08 for a confrence.
ESC08-00155 Random Inspection12/3/200812/3/200812/3/2008 2:14:16 PMPPART
Minor sediment in the gutterpan.
ESC07-00989 Site Final12/3/200812/3/200812/3/2008 2:08:34 PMPPASS
ESC05-01969 DOC - Permit Expired12/3/200812/3/200812/3/2008 1:59:22 PMPPASS
ESC04-01331 Site Final12/3/200812/3/200812/3/2008 1:58:41 PMPPASS
ESC05-01428 Site Final12/3/200812/3/200812/3/2008 1:58:11 PMPPASS
ESC08-00141 Random Inspection12/3/200812/3/200812/3/2008 1:56:49 PMPPASS
ESC08-00821 Random Inspection12/3/200812/3/200812/3/2008 1:54:24 PMPPASS
No issues.
ESC08-01002 Site Preparation11/28/200812/3/200812/3/2008 1:39:27 PMAPASS
ESC07-01520 Site Final11/19/200812/3/200812/3/2008 1:17:16 PMANR
ESC08-00758 Complaint Inspection12/3/200812/3/200812/3/2008 12:15:56 PMAFAIL
spoke with the RP over the issue of tracking and we came up with a plan on how deal with any tracking off of the project area. Will re-inspect on 12/5/08
ESC08-00407 Site Preparation11/26/200812/3/200812/3/2008 10:53:55 AMANR
ESC08-01014 Site Preparation ESC12/3/200812/3/200812/3/2008 10:19:05 AM PASS
ESC08-00467 General Inspection12/3/200812/3/200812/3/2008 10:09:02 AM CANC
Temporary slope protection in good shape.
ESC08-00684 General Inspection12/3/200812/3/200812/3/2008 9:36:38 AM PASS
ESC08-00503 General Inspection12/3/200812/3/200812/3/2008 8:24:56 AM PASS