FIR02-00133
| FIR-Aging Inspection | 12/3/2009 | 12/3/2009 | 12/7/2009 4:37:54 PM | P | DONE |
|
|
Okay for permit final
|
FIR08-00446
| INSP-Sprinkler Rough-in/Hydro | 12/3/2009 | 12/3/2009 | 12/3/2009 5:18:19 PM | P | NR |
|
|
|
BLD09-01924
| FIRE-Conference | 12/3/2009 | 12/3/2009 | 12/3/2009 5:17:25 PM | P | DONE |
|
|
Site visit with contractor regarding third floor exit signs, hardware at access control doors, upgrade agreement, first floor occupancy, and project schedule.
|
FIR09-00658
| INSP-Sprinkler Rough-in | 12/2/2009 | 12/3/2009 | 12/3/2009 3:26:47 PM | P | PART |
|
|
Correction items and the remainder of overhead rough-in okayed, dry pendents at the exterior canopies are not yet installed, discussed hydrostatic testing schedule.
|
FIR09-00540
| INSP-Sprinkler Rough-in | 12/3/2009 | 12/3/2009 | 12/3/2009 3:24:34 PM | A | PART |
|
|
Verified added upright protection at the first floor canopies, overhead installation at both the first and second floors okay for cover.
|
BLD09-02145
| FIRE-Final Inspection | 12/3/2009 | 12/3/2009 | 12/3/2009 2:44:46 PM | P | PASS |
|
|
Fire life safety inspection passed. NOTE: locking hardware is not allowed at the exits from the south room unless panic hardware is provided from the egress side as discussed.
|
FIR08-00005
| INSP-Final Inspection | 12/3/2009 | 12/3/2009 | 12/3/2009 2:41:27 PM | A | PASS |
|
|
Field inspection passed per activity notes 1/15/08.
|
BLD09-00295
| FIRE-Final Inspection | 12/2/2009 | 12/3/2009 | 12/3/2009 2:39:54 PM | A | PASS |
|
|
Fire life safety is acceptable pending approved hardware at the inactive door leaf on the main entry/exit pair of doors-see review comment # 5. Structural inspector to verify prior to permit final.
|
BLD09-00378
| FIRE-Conference | 12/3/2009 | 12/3/2009 | 12/3/2009 1:53:21 PM | A | DONE |
|
|
Regarding exit sign location at the new vestibule.
|