Inspections for the day of: Thursday, December 3, 2009.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00440 INSP-Sprinkler Rough-in/Hydro12/3/200912/3/200912/3/2009 3:28:11 PMPPASS
The sprinkler piping can now be covered.
FIR09-00274 INSP-Final Inspection12/3/200912/3/200912/3/2009 3:17:31 PMPPASS
permit finaled
FIR09-00419 INSP-Supply line flush12/2/200912/3/200912/3/2009 2:58:43 PMAPASS
The underground flush passed.
FIR09-00516 FIR-Aging Inspection12/3/200912/3/200912/3/2009 2:42:56 PM NR
Work is in progress. The building is still under construction.
BLD09-00945 FIRE-Final Inspection12/3/200912/3/200912/3/2009 2:41:14 PMPPART
Phase 4 fire life safety is complete.
FIR09-00635 INSP-Alarm Testing12/3/200912/3/200912/3/2009 2:40:19 PMPDONE
Phase 4 fire alarm installation and testing is complete.
BLD09-02082 FIRE-Final Inspection12/3/200912/3/200912/3/2009 1:51:39 PMPPASS
Life safety passed.
FIR09-00682 INSP-Final Inspection12/2/200912/3/200912/3/2009 1:39:27 PMAPASS
Permit finaled
BLD09-01771 FIRE-Final Inspection12/2/200912/3/200912/3/2009 10:28:31 AMAFAIL
Provide approved single action hardware on the two new doors, provide new fire extinguisher as discussed and repair the new exit sign/emergency light.
FIR09-00440 INSP-Sprinkler Rough-in/Hydro12/2/200912/3/200912/3/2009 10:27:30 AMAPASS
The overhead piping passed the hydro tests.
BLD09-00945 FIRE-Final Inspection12/2/200912/3/200912/3/2009 9:21:52 AMAFAIL
This inspection was for phase 4. The project related fire alarm permit needs passed for this area and the exit sign/emergency light re-oriented as per the city approved plans.
FIR09-00635 INSP-Final Inspection12/2/200912/3/200912/3/2009 9:19:23 AMAFAIL
This inspection is for phase 4. One additional horn/strobe needs to be installed as per the approved plans. Also horn only devices were not installed in the right hand corridor system of phase 4 as per the plans. Either re-install the horns or provide code compliant coverage through out the entire space served by the corridor system which includes the Lobby area.
BLD09-01628 FIRE-Final Inspection12/2/200912/3/200912/3/2009 9:15:47 AMAPASS
Life safety passed