FIR05-00128
| FIR-Aging Inspection | 12/3/2010 | 12/3/2010 | 12/8/2010 2:18:26 PM | | PASS |
|
|
Permit final okay- work completed.
|
BLD10-01868
| BLD-Aging Inspection | 12/3/2010 | 12/3/2010 | 12/7/2010 5:08:42 PM | A | FAIL |
|
|
Site visit confirmed correction items are not complete. Phoned Todd the tenant manager at ####-#### and left message regarding conditions for certificate of occupancy.
|
FIR10-00565
| INSP-Final Inspection | 12/2/2010 | 12/3/2010 | 12/6/2010 5:14:56 PM | A | NR |
|
|
|
FIR10-00470
| INSP-Sprinkler Rough-in | 12/2/2010 | 12/3/2010 | 12/3/2010 2:42:10 PM | P | FAIL |
|
|
Overhead hydrostatic test failed due to 7 psi pressure loss at the guage. Manifold and FDC hydro test passed.
|
FIR10-00257
| INSP-Conference | 12/3/2010 | 12/3/2010 | 12/3/2010 2:03:21 PM | P | DONE |
|
|
Regarding project schedule.
|
BLD10-02610
| FIRE-Final Inspection | 12/2/2010 | 12/3/2010 | 12/3/2010 12:59:00 PM | A | PASS |
|
|
Tenant to provide approved door hardware at the second exit and repair one EM light at the main entry prior to structural final as discussed.
|
BLD10-01201
| FIRE-Conference | 12/3/2010 | 12/3/2010 | 12/3/2010 12:56:52 PM | A | DONE |
|
|
Regarding project related fire alarm work.
|
BLD10-01637
| FIRE-Conference | 12/3/2010 | 12/3/2010 | 12/3/2010 11:49:09 AM | A | DONE |
|
|
Regarding fire alarm notification at the restroom remodel.
|
BLD10-02103
| FIRE-Final Inspection | 11/30/2010 | 12/3/2010 | 12/3/2010 11:17:07 AM | A | FAIL |
|
|
Correction items include provide approved hardware at the main entry/exit door, remove manual surface and thumbturn locks at the west basement exit door, repair exit sign/EM light at the basement, doors/ hardware and ramp at the east exit are not yet installed or finished.
|