Inspections for the day of: Monday, December 3, 2012.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00560 Site Preparation12/3/201212/3/201212/3/2012 3:16:33 PMADONE
No activity
ESC12-00467 General Inspection12/3/201212/3/201212/3/2012 2:41:04 PM PASS
ESC10-00657 General Inspection12/3/201212/3/201212/3/2012 2:28:38 PM CANC
moved to 12/4/2012 pm.
ESC11-00874 BMP Violation11/30/201212/3/201212/3/2012 2:27:59 PMAFAIL
2nd correction notice:
Clean up all sediment and debris off of the hard surfaces. Maintain storm drain inlet protection. Maintain the sediment barriers along Shoup. Provide a schedule map showing activities though out the project area.
Failure to comply with the given notice will result in further enforcement. Will re-inspect on 12/4/2012 p.m.
ESC12-00939 BMP Violation11/29/201212/3/201212/3/2012 1:48:39 PMAPASS
ESC12-01060 Site Preparation11/30/201212/3/201212/3/2012 11:18:58 AMAPART
Need to post ESC sign
ESC12-01059 Site Preparation11/30/201212/3/201212/3/2012 11:18:31 AMAPART
Need to post ESC sign
ESC12-01058 Site Preparation11/30/201212/3/201212/3/2012 11:18:04 AMAPART
Need to post ESC sign
ESC12-01122 Site Preparation11/30/201212/3/201212/3/2012 11:17:40 AMAPART
Need to post ESC sign
ESC12-01064 Site Preparation11/30/201212/3/201212/3/2012 11:16:53 AMAPASS
ESC12-01061 Site Preparation11/30/201212/3/201212/3/2012 11:16:43 AMAPASS
ESC12-01062 Site Preparation11/30/201212/3/201212/3/2012 11:16:25 AMAPASS
ESC12-01063 Site Preparation11/30/201212/3/201212/3/2012 11:16:11 AMAPASS
ESC12-01057 Site Preparation11/30/201212/3/201212/3/2012 11:16:00 AMAPASS
ESC12-00067 BMP Violation11/30/201212/3/201212/3/2012 8:56:26 AMAPART
95% of the violation have beeen corrected. Will re-inspect this afternoon to go over the additional items.
1. Maintain the silt fence whare is will installed correctly. Provide a containment for mixing and cleaning of non storm water pollutants in the area where needed on site prior to the activities begining again.