Inspections for the day of: Tuesday, December 3, 2013.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00504 INSP-Sprinkler Rough-in12/2/201312/3/201312/18/2013 4:58:59 PMPPART
FIR13-00509 INSP-Sprinkler Rough-in12/2/201312/3/201312/18/2013 4:58:25 PMPPART
FIR13-00638 INSP-Sprinkler Rough-in12/2/201312/3/201312/4/2013 7:13:37 AMPPART
Overhead rough-in inspection completed- Refer to dated annotations on plans for areas in need of revision. Add missing head at the stock area SW corner, maintain coverage at the janitors room, pendents in the mens RR are at min. separation, provide coverage for the cart corral below the CCTV room, front entry vestibule and canopy are not yet constructed. Spacing adjustments at the NE wall okayed. Area separation walls to be full height in the stock room offices as discussed.
FIR13-00628 INSP-Sprinkler Rough-in12/3/201312/3/201312/4/2013 7:05:38 AMPPART
Refer to plans for dated annotations. Overhead work okayed to cover with the exception of three heads to be relocated due to spacing issues, and two hangers at armovers. Also clouded one area at the north side area "A" not ready for cover approval.
BLD13-01637 FIRE-Final Inspection12/2/201312/3/201312/3/2013 11:25:51 AMADEFR
Diane Phone #: ###-#### * Incorrect permit number request- There are no FIR inspections related to this project. Phoned listed contact to inform
FIR13-00608 INSP-Sprinkler Rough-in12/3/201312/3/201312/3/2013 11:12:16 AMAPART
Overhead fire sprinkler work at the grid ceilings approved for cover. Ref. dated annotations on plans.
FIR13-00440 INSP-Sprinkler Rough-in12/2/201312/3/201312/3/2013 11:09:44 AMANR
Project not in condition to complete a satisfactory pump acceptance test at this time.