ELE14-03327
| Temporary Service | 12/3/2014 | 12/3/2014 | 12/3/2014 12:54:51 PM | P | DONE |
|
|
Tim is the General Contractor and will be available by phone. Phone #: ###-#### Inspection requested via web by John Harvey TS, OH, N, OK
|
ELE14-03285
| Permanent Service | 11/26/2014 | 12/3/2014 | 12/3/2014 12:32:58 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Schroeder PS, OH, N, OK
|
ELE13-02557
| Electrical Rough-In | 12/3/2014 | 12/3/2014 | 12/3/2014 11:58:41 AM | P | DONE |
|
|
Dave-customer not sure what type of inspection it is-please call prior homeowner would like to talk to you Phone #: ###-#### Conference for next step on what to do. Discussed arc fault requirements, and 4 wire requirements for range and dryer since existing panel is now sub panel. OK to cover final wall
|
ELE14-03325
| Temporary Service | 12/3/2014 | 12/3/2014 | 12/3/2014 11:14:59 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn TS,UG,N,OK
|
ELE14-03329
| Electrical Rough-In | 12/3/2014 | 12/3/2014 | 12/3/2014 11:12:52 AM | P | CANC |
|
|
Floor heat master bathroom Phone #: ###-#### >> Inspection requested via web by Chris Chesnut Inspection cancelled from web by: Chris Chesnut
|
ELE13-00238
| ELE-Aging Inspection | 12/3/2014 | 12/3/2014 | 12/3/2014 10:55:16 AM | | DONE |
|
|
left message for Kevin
|
ELE14-03299
| Electrical Rough-In | 12/3/2014 | 12/3/2014 | 12/3/2014 10:43:05 AM | P | PASS |
|
|
call Joe Levitch (###-####) for access, 1/2 hr heads up would be great - Thanks Phone #: ###-#### Inspection requested via web by Andy Derrick Master bath floor heat, OK to cover
|
ELE14-03299
| Electrical Rough-In | 12/3/2014 | 12/3/2014 | 12/3/2014 10:40:23 AM | A | PASS |
|
|
Floor heat, master bath OK to cover
|
ELE14-03299
| Electrical Rough-In | 12/2/2014 | 12/3/2014 | 12/3/2014 10:07:04 AM | A | NH |
|
|
contact - Joe Levitch ###-#### Phone #: ###-#### Inspection requested via web by Andy Derrick third trip here, no access
|
ELE14-03298
| Electrical Rough-In | 12/2/2014 | 12/3/2014 | 12/3/2014 9:44:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender RI ok to cover
|
ELE14-02616
| Final | 12/2/2014 | 12/3/2014 | 12/3/2014 9:08:26 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jay Symonds talked to contractor 210.8A2 GFI protection required garage 210.8A7 GFI protection required within 6 foot of sink 422.31A permanently installed appliance requires disconnecting means
|
ELE14-03299
| Final | 12/2/2014 | 12/3/2014 | 12/2/2014 4:29:42 PM | A | FAIL |
|
|
Floor heat to be installed to product specs and listings.
|