MEC14-05180
| Rough-in | 12/3/2014 | 12/3/2014 | 12/3/2014 12:00:00 AM | P | FAIL |
|
|
The chase built to continue to the first floor is required to be built as a rated shaft design per the mechanical plans.
The return air at the basement cannot terminate as above ceiling and create a plenum. Must be ducted to the kitchen area. Called the mechanical engineer and informed him of these issues that are going to need to be addressed.
|