Inspections for the day of: Thursday, December 3, 2015.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-03707 BLD-Footing12/3/201512/3/201512/3/2015 7:59:42 PMPNR
Manual Phone #: ###-####
BLD15-02037 BLD-Footing12/2/201512/3/201512/3/2015 7:59:18 PMPPART
mono-footing; Matt Phone #: ###-####
MTI on site
BLD15-01869 BLD-Other12/1/201512/3/201512/3/2015 7:58:13 PMPPART
masonary grout pour (12ft lift on east side, 16ft lift west side), reinforced slab (showroom side slab area C ) - Clinton Phone #: ###-####
OK pending MTI specvial insp, tests and approvals.
BLD15-03877 BLD-Foundation12/3/201512/3/201512/3/2015 7:56:01 PMPPASS
Adam Phone #: ###-####
BLD14-01829 BLD-Wall Bracing12/1/201512/3/201512/3/2015 1:17:15 PMPNR
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD14-01829 BLD-Wall Bracing12/1/201512/3/201512/3/2015 11:54:35 AMANR
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
BLD15-02693 BLD-Final12/2/201512/3/201512/3/2015 11:44:32 AMANR
Austin Phone #: ###-####
Need Plumb Final.
BLD15-04206 BLD-Framing/Rough-in12/2/201512/3/201512/3/2015 11:43:13 AMAPASS
Elliot Phone #: ###-####// please call for access
GCB15-00125 GCB-Courtesy12/2/201512/3/201512/3/2015 11:42:56 AMADONE
Scott ###-####
Pre- constr conf.......Talked about cold weather concrete provisions. Gave Scott copy of Bldg Safety Collaborative interpretation handout on topic. MTI is hired to perform all special inspections.
BLD15-03049 BLD-Final12/1/201512/3/201512/3/2015 11:06:39 AMAPASS
Evan Phone #: ###-####
BLD15-03049 DOC - Permit Finaled12/3/201512/3/201512/3/2015 11:06:23 AMPPASS
BLD15-03235 BLD-Wall Bracing12/2/201512/3/201512/3/2015 9:47:37 AMAPASS
Shear // Robert Phone #: ###-####