BLD15-03707
| BLD-Footing | 12/3/2015 | 12/3/2015 | 12/3/2015 7:59:42 PM | P | NR |
|
|
Manual Phone #: ###-####
|
BLD15-02037
| BLD-Footing | 12/2/2015 | 12/3/2015 | 12/3/2015 7:59:18 PM | P | PART |
|
|
mono-footing; Matt Phone #: ###-#### MTI on site
|
BLD15-01869
| BLD-Other | 12/1/2015 | 12/3/2015 | 12/3/2015 7:58:13 PM | P | PART |
|
|
masonary grout pour (12ft lift on east side, 16ft lift west side), reinforced slab (showroom side slab area C ) - Clinton Phone #: ###-#### OK pending MTI specvial insp, tests and approvals.
|
BLD15-03877
| BLD-Foundation | 12/3/2015 | 12/3/2015 | 12/3/2015 7:56:01 PM | P | PASS |
|
|
Adam Phone #: ###-####
|
BLD14-01829
| BLD-Wall Bracing | 12/1/2015 | 12/3/2015 | 12/3/2015 1:17:15 PM | P | NR |
|
|
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD14-01829
| BLD-Wall Bracing | 12/1/2015 | 12/3/2015 | 12/3/2015 11:54:35 AM | A | NR |
|
|
First and second floor sheer Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD15-02693
| BLD-Final | 12/2/2015 | 12/3/2015 | 12/3/2015 11:44:32 AM | A | NR |
|
|
Austin Phone #: ###-#### Need Plumb Final.
|
BLD15-04206
| BLD-Framing/Rough-in | 12/2/2015 | 12/3/2015 | 12/3/2015 11:43:13 AM | A | PASS |
|
|
Elliot Phone #: ###-####// please call for access
|
GCB15-00125
| GCB-Courtesy | 12/2/2015 | 12/3/2015 | 12/3/2015 11:42:56 AM | A | DONE |
|
|
Scott ###-#### Pre- constr conf.......Talked about cold weather concrete provisions. Gave Scott copy of Bldg Safety Collaborative interpretation handout on topic. MTI is hired to perform all special inspections.
|
BLD15-03049
| BLD-Final | 12/1/2015 | 12/3/2015 | 12/3/2015 11:06:39 AM | A | PASS |
|
|
Evan Phone #: ###-####
|
BLD15-03049
| DOC - Permit Finaled | 12/3/2015 | 12/3/2015 | 12/3/2015 11:06:23 AM | P | PASS |
|
|
|
BLD15-03235
| BLD-Wall Bracing | 12/2/2015 | 12/3/2015 | 12/3/2015 9:47:37 AM | A | PASS |
|
|
Shear // Robert Phone #: ###-####
|