Inspections for the day of: Thursday, December 3, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00471 INSP-Sprinkler Rough-in/Hydro12/2/201512/3/201512/3/2015 3:18:58 PMPPASS
Underground hydro test passed
BLD15-01259 FIRE-Final Inspection12/3/201512/3/201512/3/2015 2:18:39 PMPFAIL
Provide fire access signage as discussed, remove the deadbolt at door 113, provide modifications to the duct smoke detectors as discussed and test.
FIR15-00832 INSP-Final Inspection12/3/201512/3/201512/3/2015 1:54:14 PMPPASS
permit finaled
BLD15-04206 FIRE-Conference12/2/201512/3/201512/3/2015 12:57:17 PMADONE
Elliot and I discussed the single horn/strobe located within this tenant space. I deferred him to plan review and a fire alarm contractor
BLD15-03328 FIRE-Final Inspection12/2/201512/3/201512/3/2015 10:04:18 AMAPASS
life safety passed. Need suite number prior to a building inspection
BLD15-04156 FIRE-Final Inspection12/2/201512/3/201512/3/2015 9:43:55 AMAPASS
Life safety passed
FIR15-00660 INSP-Sprinkler Rough-in/Hydro12/2/201512/3/201512/3/2015 9:38:07 AMPCANC
Cancel per Matt
BLD15-03635 FIRE-Final Inspection12/2/201512/3/201512/3/2015 9:27:31 AMACANC
Cancel per Brady Phone #: ###-####
BLD15-03623 FIRE-Final Inspection12/2/201512/3/201512/3/2015 9:27:05 AMACANC
Cancel per Brady Phone #: ###-####
BLD15-03461 FIRE-Final Inspection12/2/201512/3/201512/3/2015 9:26:36 AMAPART
A temporary 30 occupancy is being given with scott arellano's permission until the new double exit doors have been installed and inspected.
BLD15-03878 FIRE-Final Inspection12/2/201512/3/201512/3/2015 9:06:24 AMAPASS
life safety passed