BLD17-04285
| BLD-Concrete | 12/3/2018 | 12/3/2018 | 12/5/2018 5:32:44 AM | P | PASS |
|
|
Ken Phone #: ###-####
|
BLD18-01269
| BLD-Final | 12/3/2018 | 12/3/2018 | 12/3/2018 2:59:58 PM | P | PASS |
|
|
Zack Phone #: ###-####
|
BLD18-03003
| BLD-Energy code compliance | 12/3/2018 | 12/3/2018 | 12/3/2018 1:52:14 PM | P | PASS |
|
|
Manny Phone #: ###-####
|
BLD18-03802
| BLD-Foundation | 12/3/2018 | 12/3/2018 | 12/3/2018 12:31:15 PM | P | CANC |
|
|
Matt Phone #: ###-####
|
BLD18-03955
| BLD-Footing | 12/3/2018 | 12/3/2018 | 12/3/2018 12:31:00 PM | P | CANC |
|
|
Matt Phone #: ###-####
|
BLD17-04465
| BLD-Framing/Rough-in | 11/30/2018 | 12/3/2018 | 12/3/2018 10:22:44 AM | A | PASS |
|
|
Secondary roof truss framing inspection after initial walk through at time of first inspection, and verbal confirmation to proceed with spray foam on Friday (11/30), of roof trusses from Gridline 11 to 3. Early Am if possible. Phone #: ###-#### Inspection requested via web by Hunter Gomez
|
BLD18-01139
| BLD-Final | 11/30/2018 | 12/3/2018 | 12/3/2018 9:19:35 AM | A | PART |
|
|
Kelly Phone #: ###-#### P I C U ok for temp occ
|