ELE99-04601
| Electrical Rough-In | 12/29/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | A | FAIL |
|
|
GEORGE ###-#### CONFERNCE AND INSPECTION PLEASE CALL. Called as requested 3 times; no answer. Left card.
|
ELE99-04512
| Electrical Rough-In | 12/29/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 09:07:05. Contact: ###-####. 10 patient- care rooms Ele. R/I walls; 2nd floor.
|
ELE99-04280
| Electrical Rough-In | 12/29/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 12:45:39. Contact: ###-####. Ceiling Ele. R/I.
|
ELE99-03064
| Electrical Rough-In | 12/29/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/29/1999 at 13:44:04. Contact: . 2-walls ele. R/I.
|
ELE99-04586
| Temporary Service | 12/29/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | A | PASS |
|
|
FOR A TRAILER SID ###-#### Temporary service- ADA county courthouse bld.
|
ELE99-04482
| Final | 12/29/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | A | PASS |
|
|
###-#### craig. Corr. Completed.
|
ELE99-04601
| Electrical Rough-In | 12/30/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | P | PART |
|
|
Ele. R/I; rooms remodel (4-plex).
|
ELE99-04583
| Final | 12/30/1999 | 12/30/1999 | 12/30/1999 12:00:00 AM | P | PASS |
|
|
Checked for inspectioin certificate tag @ meter.
|