PLM02-02844
| PLM-Aging Inspection | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | | PASS |
|
|
final ok 12/30/2002 9:35:23 AM
|
PLM02-03285
| PLM-Aging Inspection | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | | NR |
|
|
will final when project is complete 12/30/2002 9:34:14 AM
|
PLM02-03286
| PLM-Aging Inspection | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | | NR |
|
|
will final when project is complete 12/30/2002 9:34:40 AM
|
PLM02-03843
| Final | 12/27/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/27/2002 at 15:29:33. Contact: ###-####. fi 12/30/2002 9:31:40 AM nal ok 12/30/2002 9:31:45 AM
|
PLM02-03872
| Plumbing Rough-in | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | PASS |
|
|
###-#### RUSS ri ok, will change out 2 valves at the water heater to valves that have a upc stamp 12/30/2002 1:59:55 PM
|
PLM02-03625
| Final | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/30/2002 at 08:13:33. Contact: ###-####. left message with louise with p.w. about the ground work on the west side of the building 2-wc, 2-lavs, in addition to the finished restrooms on this plan. final ok 12/30/2002 2:28:33 PM
|
PLM02-02814
| Sprinkler (Final) | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | PASS |
|
|
sprinkler final ok
|
PLM02-03879
| Plumbing Rough-in | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | PART |
|
|
###-#### bob just the sewer stub from one side of the duplex to the other and then outside, test ok. 12/31/2002 9:10:10 AM
|