BLD02-02281
| BLD-Framing/Rough-in | 12/28/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/28/2002 at 16:31:34. Contact: ###-####. C/N posted--No truss package at time of inspection-will need to inspect plus verify other c/n items at energy--ok to insulate. 12/30/2002 10:11:42 AM
|
MEC02-03786
| Pressure Test | 12/27/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD02-02209
| BLD-Framing/Rough-in | 12/27/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/27/2002 at 16:37:15. Contact: ###-####. Needs plumbing, mechanical and air seal package prior to framing inspection. 12/30/2002 1:29:20 PM
|
BLD01-02513
| BLD-Final | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | DONE |
|
|
###-#### KEITH Passed already--by inspector #425.-Core and Shell 12/30/2002 1:57:18 PM
|
BLD02-02374
| BLD-Final | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-01721
| BLD-Final | 12/30/2002 | 12/30/2002 | 12/30/2002 12:00:00 AM | P | PASS |
|
|
Prior c/n item done--verified tempered glass via data provide on Glass-Gard product. Finals completed. 12/30/2002 1:58:35 PM
|