MEC03-02714
| MEC-Aging Inspection | 12/30/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | | CANC |
|
|
no insp called for. 12/30/2003 10:49:46 AM
|
BLD03-02842
| BLD-Framing/Rough-in | 12/29/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | A | FAIL |
|
|
CARL; Phone #: ###-#### Internet Inspection Request from: Darla Downs Needs paper removed from insulation above walls and attached engineering not on site nothing posted c/n. 12/30/2003 12:09:40 PM
|
BLD03-01377
| BLD-Framing/Rough-in | 12/29/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | A | FAIL |
|
|
cell ###-#### 12/29/2003 3:43:53 PM > this needs penetrations of 1 hr walls completed. also went over this with contractor. 12/30/2003 12:08:57 PM
|
BLD03-01631
| BLD-Final | 12/29/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/29/2003 at 1:22:28 PM. Contact: ###-####.
|
MEC03-03701
| Rough-in | 12/30/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | P | PASS |
|
|
Northwest ###-####
|
MEC03-03701
| Final | 12/30/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | P | PASS |
|
|
Northwest ###-####
|
MEC03-03497
| Rough-in | 12/30/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
MEC03-03497
| Pressure Test | 12/30/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England
|
BLD03-00781
| BLD-Energy code compliance | 12/30/2003 | 12/30/2003 | 12/30/2003 12:00:00 AM | P | CANC |
|
|
Insulation inspection D wing; Phone #: ###-#### Internet Inspection Request from: Wayne Coleman Out of time will clone for am inspection Russ. 12/30/2003 4:30:54 PM
|