BLD04-00640
| BLD-Framing/Rough-in | 12/29/2005 | 12/30/2005 | 12/30/2005 3:03:51 PM | P | FAIL |
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Ceiling grid in basement.
|
BLD04-03025
| BLD-Framing/Rough-in | 12/30/2005 | 12/30/2005 | 12/30/2005 2:32:41 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/30/2005 at 11:13:44 AM. Contact: ###-####. 1st to 2nd floor shear nailing and floor to floor straps at exterior walls north and south wings. Also shear nailing on exterior walls at pavillion.
|
BLD05-01823
| BLD-Footing | 12/29/2005 | 12/30/2005 | 12/30/2005 10:12:21 AM | A | CANC |
|
|
donnie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Noted that project is receiving special inspection.
|
MIS05-00228
| BLD-Final | 12/29/2005 | 12/30/2005 | 12/30/2005 10:09:38 AM | A | PEND |
|
|
sammy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Will be ok for perm occ once fire/life/safety has finaled.
|
BLD05-03050
| BLD-Framing/Rough-in | 12/29/2005 | 12/30/2005 | 12/30/2005 9:20:29 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 12:18:00 PM. Contact: ###-####. Needs elec. r.i. insp. and no approved plans on site.
|
BLD05-02922
| BLD-Energy code compliance | 12/29/2005 | 12/30/2005 | 12/30/2005 8:54:09 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 4:12:57 PM. Contact: ###-####.
|