Inspections for the day of: Wednesday, December 30, 2009.
Number of inspections: 13
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00864 FIRE-Conference12/16/200912/29/2009 A 
Evelyn phone ###-#### Follow up on occupancy.
BLD09-02219 FIRE-Final Inspection12/30/200912/30/200912/31/2009 2:31:17 PMPPASS
life safety passed.
BLD09-00267 FIRE-Final Inspection12/29/200912/30/200912/30/2009 3:29:10 PMPFAIL
See the city approved plans, Electrical sheets, for locations where exit lights and emergency lighting needs repaired. Also an additional emergency light needs to be added in the public accessible beer cooler. See sheet F2 for corrections marked in red where fire extinguisher locations need to be modified. The fire proofing in the "dog house" is acceptible and the product used was verified with Tim Frost.
BLD09-00616 FIRE-Final Inspection12/30/200912/30/200912/30/2009 3:21:13 PMPCANC
Cancelled due to time constraints.
FIR09-00418 INSP-Final Inspection12/29/200912/30/200912/30/2009 3:20:50 PMPCANC
Cancelled due to time constraints.
FIR09-00494 INSP-Sprinkler Rough-in12/30/200912/30/200912/30/2009 3:04:26 PMPPASS
See the lasted version of the city approved plans for additional areas where the hardlid ceilings can be installed and cover the sprinkler piping.
BLD09-00945 FIRE-Final Inspection12/29/200912/30/200912/30/2009 3:03:22 PMAPART
Phase 2 life safety is passed. The stand alone duct smoke detector passed inspection. The access controled egress lock has been disabled for now. I spoke to Darren about this door issue needing addressed prior to final sign off of the project.
BLD09-01752 FIRE-Final Inspection12/29/200912/30/200912/30/2009 3:01:16 PMPPASS
Life safety passed
FIR09-00305 INSP-Final Inspection12/30/200912/30/200912/30/2009 12:05:48 PMPPASS
Permit finaled. The monitoring account has been set up.
FIR09-00304 INSP-Final Inspection12/30/200912/30/200912/30/2009 12:05:28 PMPPASS
Permit finaled. The monitoring account has been set up.
FIR09-00675 INSP-Sprinkler Rough-in/Hydro12/30/200912/30/200912/30/2009 11:06:18 AMACANC
Rescheduled for tomorrow
FIR09-00710 INSP-Final Inspection12/29/200912/30/200912/30/2009 9:41:48 AMAPASS
Permit finaled
BLD09-02219 FIRE-Final Inspection12/29/200912/30/200912/30/2009 9:41:26 AMAFAIL
Provide a sticker at the main exit as discussed, provide a fire extinguisher with current inspection tag and block/cover the rear exit door or provide code compliant hardware and remove the three dead bolts.