PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, December 30, 2009
.
Number of inspections:
21
Percentage of inspections complete:
86 %
Percentage of inspections not complete:
14 %
Contact Information
Inspector
Mike Jordan
Title
BLD-COM/RES INSPECTOR
Phone #
794-9473
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00633
Site Final
12/23/2009
12/23/2009
A
ESC09-00632
Site Final
12/23/2009
12/23/2009
A
ESC09-00628
Site Final
12/23/2009
12/23/2009
A
BLD09-01692
BLD-Aging Inspection
12/30/2009
12/30/2009
12/30/2009 3:44:25 PM
NR
ESC09-00270
Random Inspection
12/30/2009
12/30/2009
12/30/2009 3:43:28 PM
P
PASS
BLD09-00737
BLD-Framing/Rough-in
12/30/2009
12/30/2009
12/30/2009 3:42:45 PM
P
PART
Jim Phone #: ###-####. 2nd. floor, face layer of 5/8 type x rock, both sides for 2hr. firewall.
ESC09-00272
Random Inspection
12/30/2009
12/30/2009
12/30/2009 3:41:42 PM
P
PASS
BLD09-00738
BLD-Framing/Rough-in
12/30/2009
12/30/2009
12/30/2009 3:41:31 PM
P
PASS
Jim Phone #: ###-####. 2nd floor, face layer of 5/8 type x rock, both sides for 2hr. firewall.
ESC09-00273
Random Inspection
12/30/2009
12/30/2009
12/30/2009 3:40:41 PM
P
PASS
BLD09-00739
BLD-Framing/Rough-in
12/30/2009
12/30/2009
12/30/2009 3:40:29 PM
P
PART
Jim Phone #: ###-####. 2nd. floor, face layer of 5/8 type x rock, both sides for 2hr. firewall.
ESC09-00274
Random Inspection
12/30/2009
12/30/2009
12/30/2009 3:39:43 PM
P
PASS
BLD09-00740
BLD-Framing/Rough-in
12/30/2009
12/30/2009
12/30/2009 3:39:30 PM
P
PART
Jim Phone #: ###-####. 2nd floor, face layer of 5/8 type x rock, both sides for 2hr. fire wall.
BLD09-01752
BLD-Final
12/29/2009
12/30/2009
12/30/2009 3:13:45 PM
P
PART
Mike Phone #: ###-####. Ok for temp occ. Will be ok for perm. occ once elec. signs perm.
ESC09-00531
General Inspection
12/30/2009
12/30/2009
12/30/2009 1:35:11 PM
P
PASS
BLD09-01417
BLD-Framing/Rough-in
12/30/2009
12/30/2009
12/30/2009 1:34:45 PM
P
FAIL
Kent Phone #: ###-####. Needs to complete airseal package prior to framing inspection. Also needs to provide city set of approved plans and truss engineering. c/n was issued.
BLD06-02205
BLD-Final
12/28/2009
12/30/2009
12/30/2009 10:27:09 AM
A
PASS
James Phone #: ###-####
BLD06-02205
DOC - Permit Finaled
12/30/2009
12/30/2009
12/30/2009 10:27:02 AM
P
PASS
letter of compliance issued.
ESC06-01264
Site Final
12/30/2009
12/30/2009
12/30/2009 10:26:38 AM
A
PASS
ESC06-01264
DOC - Permit Finaled
12/30/2009
12/30/2009
12/30/2009 10:26:31 AM
P
PASS
Final stabalization was completed.
BLD09-01007
BLD-Framing/Rough-in
12/29/2009
12/30/2009
12/30/2009 9:57:36 AM
A
FAIL
Rod Phone #: ###-####. Needs to add additional bracing at 14ft. elev. as shown on approved plans at northeast and southeast steel stud columns. contractor to repair and recall inspection.
BLD09-01219
BLD-Conference
12/29/2009
12/30/2009
12/30/2009 9:31:39 AM
A
DONE
Joe Phone #: ###-####. Reviewed plans and spoke with contractor on infill for elevator shaft from cmu wall to elevator doors.