GCB11-00105
| GCB-Footing | 12/29/2011 | 12/30/2011 | 12/30/2011 4:03:12 PM | A | CANC |
|
|
Adam @ ###-####3:30 PM Inspection
|
GCB11-00104
| GCB-Footing | 12/29/2011 | 12/30/2011 | 12/30/2011 4:02:31 PM | A | PASS |
|
|
Adam @ ###-####3:30 PM Inspection
|
GCB11-00103
| GCB-Footing | 12/29/2011 | 12/30/2011 | 12/30/2011 4:02:02 PM | A | PASS |
|
|
Adam @ ###-####3:30 PM Inspection
|
BLD11-02698
| BLD-Final | 12/30/2011 | 12/30/2011 | 12/30/2011 4:01:04 PM | P | PART |
|
|
Dennis (wants temp) Phone #: ###-#### ok to occ the east half office area
|
GCB11-00088
| GCB-Framing | 12/29/2011 | 12/30/2011 | 12/30/2011 11:40:05 AM | A | PART |
|
|
Steve @ ###-####1 pm inspection call in adance c/n on site ok to insulate
|
GCB11-00093
| GCB-Fndatn/slab ins/fld vent | 12/29/2011 | 12/30/2011 | 12/30/2011 10:15:32 AM | A | PASS |
|
|
Dane @ ###-####AM Inspection Preferred
|
BLD11-01695
| BLD-Concrete | 12/29/2011 | 12/30/2011 | 12/30/2011 9:56:21 AM | A | PART |
|
|
tyler -footing pour - 11:30 if possible please Phone #: ###-#### int column pads still working on bolt placement wind issuse
|
BLD11-01695
| BLD-Other | 12/29/2011 | 12/30/2011 | 12/30/2011 9:55:17 AM | A | PART |
|
|
tyler - grouting inspection Phone #: ###-#### crew moved grout back mti will inspect final place ment of rebar and grouting
|
BLD11-00179
| BLD-Other | 12/29/2011 | 12/30/2011 | 12/30/2011 9:36:30 AM | A | PASS |
|
|
rich - shear wall Phone #: ###-####rest of the bldg ok to cover but need to check strapes
|