ESC11-00700
| Tracking Control | 12/30/2011 | 12/30/2011 | 12/30/2011 10:54:29 AM | P | FAIL |
|
|
Verbal to RP: Clean up allsediment and debris offof the alley way where excavating is occuring. Will follow up on 1/3/2011
|
ESC10-00657
| Random Inspection | 12/30/2011 | 12/30/2011 | 12/30/2011 9:45:15 AM | A | FAIL |
|
|
Message to RP and verbal to the Petra Foreman(Paul): Maintain the stabilized construction exit by the end of the day. Will follow up on 1/3/2011.
|
ESC11-00741
| BMP Violation | 12/30/2011 | 12/30/2011 | 12/30/2011 9:39:56 AM | A | FAIL |
|
|
Verbal to RP: Provide an approved storm drain inlet protection on the storm drain at the front of the project lot. Maintain all silt fence installed on the front perimeter of the lot. Also clean up all sediment and debris off of the hard surfaces. Will follow up on 1/3/2011.
|
ESC11-00822
| Tracking Control | 12/30/2011 | 12/30/2011 | 12/30/2011 9:37:45 AM | A | FAIL |
|
|
Verbal to RP: Clean up all sediment tracked off of lot from the concrete pours occuring today. Maintain the sediment barriera installed on the front perimeter of the lot. Make sure there is a concrete washout and it is being utilized. Will follow up for compliance on 1/3/2011.
|
ESC11-00434
| BMP Violation | 12/30/2011 | 12/30/2011 | 12/30/2011 9:35:31 AM | A | FAIL |
|
|
Message to RP: Provide additional sediment barriers along the drainage at the end of the silt fence. Also provide a perimeter sediment barrier along the back of sidewalk due to slope being over a 2% grade slope. Will follow up for compliance on 1/3/2011.
|