Inspections for the day of: Friday, December 30, 2011.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00700 Tracking Control12/30/201112/30/201112/30/2011 10:54:29 AMPFAIL
Verbal to RP:
Clean up allsediment and debris offof the alley way where excavating is occuring. Will follow up on 1/3/2011
ESC10-00657 Random Inspection12/30/201112/30/201112/30/2011 9:45:15 AMAFAIL
Message to RP and verbal to the Petra Foreman(Paul):
Maintain the stabilized construction exit by the end of the day. Will follow up on 1/3/2011.
ESC11-00741 BMP Violation12/30/201112/30/201112/30/2011 9:39:56 AMAFAIL
Verbal to RP:
Provide an approved storm drain inlet protection on the storm drain at the front of the project lot. Maintain all silt fence installed on the front perimeter of the lot. Also clean up all sediment and debris off of the hard surfaces. Will follow up on 1/3/2011.
ESC11-00822 Tracking Control12/30/201112/30/201112/30/2011 9:37:45 AMAFAIL
Verbal to RP:
Clean up all sediment tracked off of lot from the concrete pours occuring today. Maintain the sediment barriera installed on the front perimeter of the lot. Make sure there is a concrete washout and it is being utilized. Will follow up for compliance on 1/3/2011.
ESC11-00434 BMP Violation12/30/201112/30/201112/30/2011 9:35:31 AMAFAIL
Message to RP:
Provide additional sediment barriers along the drainage at the end of the silt fence. Also provide a perimeter sediment barrier along the back of sidewalk due to slope being over a 2% grade slope. Will follow up for compliance on 1/3/2011.