FIR13-00475
| INSP-Sprinkler Rough-in | 12/30/2013 | 12/30/2013 | 12/30/2013 5:01:41 PM | P | PART |
|
|
Inspection for cover at the sheetrock ceilings and soffits completed. Noted one head to be relocated away from HVAC diffuser at the lobby, one leaking pendent at SW office. Spacing at coverage between the hall and board room to be verified when door is installed.
|
FIR13-00429
| INSP-Sprinkler Rough-in | 12/30/2013 | 12/30/2013 | 12/30/2013 4:57:58 PM | P | PART |
|
|
Remainder of overhead work at the sheetrock soffits approved for cover, previous C/N items complete.
|
FIR12-00639
| INSP-Sprinkler Rough-in/Hydro | 12/30/2013 | 12/30/2013 | 12/30/2013 3:53:09 PM | P | PART |
|
|
UG fire supply line hydrostatic test passed.
|
FIR13-00661
| INSP-Sprinkler Rough-in | 12/30/2013 | 12/30/2013 | 12/30/2013 3:51:55 PM | P | PART |
|
|
Completed inspection for upright coverage at the basement level- noted adjustments necessary between hall 004 and conference room 005.
|
FIR12-00673
| INSP-Final Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 1:42:54 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
BLD13-00330
| FIRE-Final Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 1:40:42 PM | P | PASS |
|
|
Scope of work completed satisfactory. Fire life safety passed.
|
FIR13-00308
| INSP-Sprinkler Rough-in/Hydro | 12/30/2013 | 12/30/2013 | 12/30/2013 1:39:14 PM | P | PART |
|
|
Refer to dated annotations for areas okayed to cover.
|
FIR12-00312
| INSP-Final Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 1:36:13 PM | A | PASS |
|
|
|
FIR12-00303
| INSP-Final Inspection | 12/30/2013 | 12/30/2013 | 12/30/2013 1:34:58 PM | A | PASS |
|
|
|