GCM13-00355
| GCM-Final | 12/30/2013 | 12/30/2013 | 12/30/2013 4:59:36 PM | P | PART |
|
|
Dan ###-####...THIS SHOULD HAVE BEEN A R/I
|
GCM13-00356
| GCM-Final | 12/30/2013 | 12/30/2013 | 12/30/2013 4:13:46 PM | P | PASS |
|
|
Sam ###-####
|
MEC13-05409
| Final | 12/23/2013 | 12/30/2013 | 12/30/2013 2:35:37 PM | P | PASS |
|
|
###-#### call on the way
|
MEC13-05484
| Final | 12/27/2013 | 12/30/2013 | 12/30/2013 2:32:59 PM | P | PASS |
|
|
Please Call Robbie ###-#### @ Jims Heating Prior To Inspection Phone #: ###-#### >> Inspection requested via web by Manuel Acuna
|
MEC13-05449
| Pressure Test | 12/30/2013 | 12/30/2013 | 12/30/2013 2:24:29 PM | P | PART |
|
|
The work is in the basement. The access is the stairs down on the left side of the house. Call James at ###-#### with any questions. Thanks. >> Inspection requested via web by 4 Seasons...20lb gas ok
|
MEC13-05454
| Pressure Test | 12/26/2013 | 12/30/2013 | 12/30/2013 1:55:59 PM | P | PART |
|
|
This is a Flue Pressure Test AND Final Inspection. Pls meet our installer at home at 1 PM. Install Mger, Alan, Phone # is ###-####. Pls call homeowner prior to inspect at ###-#### Phone #: ###-#### >> Inspection requested via web by Echo Jackson....flue test ok...NEED UPPER AND LOWER COMB AIR IN DOOR GOING INTO LAUNDRY ROOM
|
MEC13-05450
| Pressure Test | 12/30/2013 | 12/30/2013 | 12/30/2013 1:54:08 PM | P | PART |
|
|
Please call Josh w/TML to schedule time, he thinking around 1pm, thank you Phone #: ###-#### >> Inspection requested via web by Michele LaMott..20lb gas ok..flue test ok..furn ok...need to check w/h at final inspection
|
MEC13-05150
| Final | 12/30/2013 | 12/30/2013 | 12/30/2013 7:55:14 AM | A | PASS |
|
|
thought it got final out Phone #: ###-#### >> Inspection requested via web by Brandon Rohricht
|
MEC13-02800
| Final | 12/30/2013 | 12/30/2013 | 12/30/2013 7:52:35 AM | A | PASS |
|
|
Late morning thanks Phone #: ###-#### >> Inspection requested via web by Brandon Rohricht
|
MEC13-00259
| Conference | 12/27/2013 | 12/30/2013 | 12/30/2013 7:44:45 AM | A | PEND |
|
|
CALL RENEE ABOUT THE STATUS OF THIS JOB
|
MEC12-04044
| Final | 12/27/2013 | 12/30/2013 | 12/30/2013 7:43:01 AM | A | PEND |
|
|
###-####
|
GCM13-00354
| GCM-Final | 12/27/2013 | 12/30/2013 | 12/30/2013 12:00:00 AM | P | CANC |
|
|
John or Dave ###-####
|