ELE13-00427
| Final | 12/30/2014 | 12/30/2014 | 12/30/2014 2:23:04 PM | P | PASS |
|
|
Inspection requested via web by steve ragan final ok
|
ELE14-03123
| Permanent Service | 12/30/2014 | 12/30/2014 | 12/30/2014 1:59:19 PM | P | PASS |
|
|
Service change Phone #: ###-#### Inspection requested via web by John VanZandt p/s o/h rec ok
|
ELE14-02091
| Final | 12/30/2014 | 12/30/2014 | 12/30/2014 1:19:28 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Nick Larson final ok on Guru donuts and Bosie Fry co
|
ELE14-03545
| Rough-In Permanent Service | 12/29/2014 | 12/30/2014 | 12/30/2014 12:30:43 PM | P | PASS |
|
|
Any questions please call, thx, TW. Phone #: ###-#### Inspection requested via web by Stephen Kren p/s u/g n ok r/i ok
|
ELE11-01656
| ELE-Aging Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 11:05:02 AM | | DONE |
|
|
spoke with Neal hes working on it
|
ELE12-01956
| ELE-Aging Inspection | 12/30/2014 | 12/30/2014 | 12/30/2014 10:51:37 AM | | DONE |
|
|
did drive by final ok
|
ELE12-01956
| Final | 12/30/2014 | 12/30/2014 | 12/30/2014 10:51:13 AM | P | PASS |
|
|
did drive by final ok
|
ELE13-00398
| Final | 12/30/2014 | 12/30/2014 | 12/30/2014 10:34:54 AM | P | PASS |
|
|
did drive by final ok
|
ELE14-03536
| Electrical Rough-In | 12/29/2014 | 12/30/2014 | 12/30/2014 10:16:31 AM | A | PASS |
|
|
For access please call Tom at ###-#### 1/2 hr prior to inspection. Inspection requested via web by Terry Scott r/i kitchen and new loadcenter ok
|
ELE14-03532
| Final | 12/29/2014 | 12/30/2014 | 12/30/2014 9:43:39 AM | A | PASS |
|
|
19 solar panels. AC micro-inverter system. No DC voltage. Enphase M250 Micro-Inverters,that are CSA, IEEE-1547, and UL-1741 listed. And 270 watt Suniva panels, ETL listed. The solar panels are arranged in two different locations on the roof. So there are two strings that come into a solar combiner box in the garage, next to the main panel. This is properly labeled as a solar combiner box, and not a branch circuit sub panel. From there, a single circuit goes out to the knife switch, located next to the meter base. And from knife switch to the breaker in main panel located in the garage. The solar fed breaker is at the top of the busing, opposite the feeder lugs. The solar breaker,knife switch and combiner box are clearly marked for solar, and the circuit number identified in the knife switch and the panel schedule. The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode. This is visible via the access panel directly under the main panel.
The main panel is in the garage, so give the homeowner a call for access at 409.7549
Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King final ok
|
GCE13-00002
| GCE-Final | 12/29/2014 | 12/30/2014 | 12/30/2014 8:36:27 AM | A | PASS |
|
|
Joe Good ###-#### - permit issued in 2013, permit reactived for final inspection data to pumps from store final ok
|