Inspections for the day of: Tuesday, December 30, 2014.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRex Boyles
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-00427 Final12/30/201412/30/201412/30/2014 2:23:04 PMPPASS
Inspection requested via web by steve ragan final ok
ELE14-03123 Permanent Service12/30/201412/30/201412/30/2014 1:59:19 PMPPASS
Service change Phone #: ###-#### Inspection requested via web by John VanZandt p/s o/h rec ok
ELE14-02091 Final12/30/201412/30/201412/30/2014 1:19:28 PMPPASS
Phone #: ###-#### Inspection requested via web by Nick Larson final ok on Guru donuts and Bosie Fry co
ELE14-03545 Rough-In Permanent Service12/29/201412/30/201412/30/2014 12:30:43 PMPPASS
Any questions please call, thx, TW. Phone #: ###-#### Inspection requested via web by Stephen Kren p/s u/g n ok r/i ok
ELE11-01656 ELE-Aging Inspection12/30/201412/30/201412/30/2014 11:05:02 AM DONE
spoke with Neal hes working on it
ELE12-01956 ELE-Aging Inspection12/30/201412/30/201412/30/2014 10:51:37 AM DONE
did drive by final ok
ELE12-01956 Final12/30/201412/30/201412/30/2014 10:51:13 AMPPASS
did drive by final ok
ELE13-00398 Final12/30/201412/30/201412/30/2014 10:34:54 AMPPASS
did drive by final ok
ELE14-03536 Electrical Rough-In12/29/201412/30/201412/30/2014 10:16:31 AMAPASS
For access please call Tom at ###-#### 1/2 hr prior to inspection. Inspection requested via web by Terry Scott r/i kitchen and new loadcenter ok
ELE14-03532 Final12/29/201412/30/201412/30/2014 9:43:39 AMAPASS
19 solar panels.
AC micro-inverter system. No DC voltage.
Enphase M250 Micro-Inverters,that are CSA, IEEE-1547, and UL-1741 listed.
And 270 watt Suniva panels, ETL listed.
The solar panels are arranged in two different locations on the roof. So there are two strings that come into a solar combiner box in the garage, next to the main panel. This is properly labeled as a solar combiner box, and not a branch circuit sub panel. From there, a single circuit goes out to the knife switch, located next to the meter base. And from knife switch to the breaker in main panel located in the garage. The solar fed breaker is at the top of the busing, opposite the feeder lugs. The solar breaker,knife switch and combiner box are clearly marked for solar, and the circuit number identified in the knife switch and the panel schedule.
The inverters, panels and rails are all bonded with a number 6 ground that runs back to the service grounding electrode. This is visible via the access panel directly under the main panel.

The main panel is in the garage, so give the homeowner a call for access at 409.7549

Thanks guys Phone #: ###-#### Inspection requested via web by Ryan King final ok
GCE13-00002 GCE-Final12/29/201412/30/201412/30/2014 8:36:27 AMAPASS
Joe Good ###-#### - permit issued in 2013, permit reactived for final inspection data to pumps from store final ok