Inspections for the day of: Wednesday, December 30, 2015.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01286 Tracking Control12/29/201512/30/201512/31/2015 9:58:10 AMACANC
rescheduled
ESC13-00684 General Inspection12/30/201512/30/201512/31/2015 9:57:38 AM PASS
ESC15-00509 General Inspection12/30/201512/30/201512/30/2015 4:27:30 PM PASS
ESC15-00660 General Inspection12/30/201512/30/201512/30/2015 4:26:46 PM PASS
ESC15-00909 Aging Inspection12/30/201512/30/201512/30/2015 3:50:37 PM PASS
No construction activity or disturbed area at site. No activity on BLD since permit issue in July 2015. No further ESC inspections. Permit finaled.
ESC15-00909 DOC - Permit Finaled12/30/201512/30/201512/30/2015 3:49:47 PMPPASS
ESC14-01011 General Inspection12/30/201512/30/201512/30/2015 1:02:41 PM PASS
WIP on interior. Numerous sub-contractor groups on site, all parking on street as instructed. No trackout, permit sign posted, and no viiolations observed.
ESC14-00759 General Inspection12/30/201512/30/201512/30/2015 11:51:54 AM PASS
ESC15-01560 Tracking Control12/29/201512/30/201512/30/2015 11:40:31 AMAPEND
WIP. Trackout observed yesterday seems to have been cleaned up to a certain extent. Crew onsite currently putting in fence. Will check for final site clean up mid week. Site is frozen and difficult for thorough sweeping.
ESC15-01256 General Inspection12/30/201512/30/201512/30/2015 11:00:36 AMPPART
WIP on frame. No significant trackout and no discharges. Trash and materials are contained.

Correction:

Need to sweep up sawdust and sand in front of driveway on street and gutter.
ESC15-00659 General Inspection12/30/201512/30/201512/30/2015 10:58:37 AM PASS
Home construction complete and BLD finaled. No sediment leaving site but site will need landscaping and temp BMP removal when weather conditions allow.
ESC15-00541 General Inspection12/28/201512/30/201512/30/2015 10:02:58 AMAPASS
WIP placing utilities. Geography/topography of site is self contained. No trackout to Bogus Basin. Vegetation surrounding drainage pond has been undisturbed. Very sandy soil.

No corrections at this time.
ESC15-00907 Aging Inspection12/30/201512/30/201512/30/2015 9:52:02 AM PASS
Project complete. No disturbed area or construction at site. All permits finaled.
ESC15-00907 DOC - Permit Finaled12/30/201512/30/201512/30/2015 9:51:19 AMPPASS
ESC15-00667 General Inspection12/30/201512/30/201512/30/2015 9:01:36 AM PASS
Work complete on Warm Springs Bypass road. Revegetation of shoulder and graded areas in progress. Monitoring conditions through winter to make sure there are no significant issues.