ELE19-03722
| Final | 12/27/2019 | 12/30/2019 | 12/30/2019 2:22:43 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Steve McCloy No card posted. Final ok
|
ELE19-04420
| Electrical Rough-In | 12/30/2019 | 12/30/2019 | 12/30/2019 2:01:16 PM | P | PASS |
|
|
Al Phone #: ###-#### Ceiling rough in ok cover
|
ELE19-04420
| Final | 12/30/2019 | 12/30/2019 | 12/30/2019 2:00:21 PM | P | PASS |
|
|
Al Phone #: ###-#### No card posted. Final ok
|
ELE19-04907
| Electrical Rough-In | 12/29/2019 | 12/30/2019 | 12/30/2019 12:33:45 PM | A | PASS |
|
|
5th floor rough in. Phone #: ###-#### Inspection requested via web by Deb Morton General contractor provided a camera to reach into wall and look at wiring method, boxes, and terminations, thank you. Level 5 wall rough in ok cover and listing of LED panels for level 1 confirmed.
|
ELE19-04839
| Electrical Rough-In | 12/27/2019 | 12/30/2019 | 12/30/2019 10:39:33 AM | A | PASS |
|
|
fritz - ceiling grid inspection Phone #: ###-#### 2001, 2002 only grid rough in ok cover
|