Inspections for the day of: Tuesday, December 31, 2002.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00283 FIR-Aging Inspection12/31/200212/31/200212/31/2002 12:00:00 AM NR
it appears that Alarmco actually did the installation work under a separate FIR permit and that this one may need to be voided when theirs is finaled 1/2/2003 11:04:28 AM
BLD01-02477 FIRE-Conference12/31/200212/31/200212/31/2002 12:00:00 AMADONE
I met with Dave with Brice Construction ###-#### at the job site about getting things wrapped up. No approved drawings were on site for any inspection. He is to get everything together and call in for the inspection. He showed me some fire alarm work that was done in conjunction with this work and there appears to be NO fire alarm permits. The work was done by Charlie at Protex. Dave said he would follow up.
BLD02-02931 FIRE-Final Inspection12/31/200212/31/200212/31/2002 12:00:00 AMAPART
All life/safety items are ok except for the duct smoke detectors. All four of them need to be tested with smoke and remote alarm LED's installed. Also one duct detector located on the north side needs to be relocated out of the 90 bend. Dave Miller with the Boise Fire Dept gave me permission to sign a temporary occupancy for these deficiencies based on the understanding that all items will be completed by Friday, January 3rd.
BLD02-02669 FIRE-Final Inspection12/30/200212/31/200212/31/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/30/2002 at 12:58:04. Contact: ###-####.