Inspections for the day of: Wednesday, December 31, 2008.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00741 Site Final12/31/200812/31/200812/31/2008 4:53:08 PMPCANC
Dereck Phone ###-####
BLD08-01127 BLD-Framing/Rough-in12/31/200812/31/200812/31/2008 4:52:50 PMPPART
CHRIS Phone #: ###-####
Hard lids....North restrooms....Curtain wall framing at South canopy OK.
BLD08-01889 BLD-Final12/31/200812/31/200812/31/2008 3:35:09 PMPNR
derick Phone #: ###-####
NR Need P/W final
BLD08-02338 BLD-Final12/30/200812/31/200812/31/2008 2:06:35 PMPPASS
dustin Phone #: ###-####
OK for Perm Occ
BLD08-02169 BLD-Framing/Rough-in12/30/200812/31/200812/31/2008 11:25:49 AMAPART
ROD Phone #: ###-####
Framing OK for restroom at mezzanine.....Infill at existing rated firewall where ductwork was removed.....OK to install final layer.
BLD08-02497 BLD-Footing12/30/200812/31/200812/31/2008 10:46:07 AMAPASS
Jay- pouring at 10- call prior to going Phone #: ###-####
ESC08-01016 Site Preparation12/31/200812/31/200812/31/2008 10:45:45 AMAFAIL
Talked to Rustin ici-gecj .....About sweeping hard surfaces daily and possibly installing a barrier at sidewalk if stockpiled soil gets into gutter/street......Screen installed in nearest drain and conc. washout pit in place.