Inspections for the day of: Thursday, December 31, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00327 Random Inspection12/31/200912/31/200912/31/2009 2:58:01 PMPPASS
ESC09-00703 Random Inspection12/31/200912/31/200912/31/2009 2:56:59 PMPPASS
ESC09-00355 Random Inspection12/31/200912/31/200912/31/2009 2:56:23 PMPPASS
ESC09-00563 Random Inspection12/31/200912/31/200912/31/2009 2:55:50 PMPPASS
ELE09-01608 ELE-Aging Inspection12/31/200912/31/200912/31/2009 2:40:28 PM DONE
no activity, suc
ELE09-02315 Electrical Rough-In12/30/200912/31/200912/31/2009 2:35:03 PMPPASS
call Loren if neccasary for above ceiling inspection for cover. 2nd floor, north west corner. Thanks! Phone #: ###-#### Internet Inspection Request from: Loren Ramsey ok to cover ceiling, no esc this project
ELE09-02478 Electrical Rough-In12/30/200912/31/200912/31/2009 1:38:14 PMPPASS
Call Loren if neccasary for rough in of walls only. 2nd floor, south east corner. Thanks! Phone #: ###-#### Internet Inspection Request from: Loren Ramsey walls only ok to cover, no esc this project
ELE09-01845 ELE-Aging Inspection12/31/200912/31/200912/31/2009 10:03:53 AM DONE
no activity, suc
ELE09-01507 ELE-Aging Inspection12/31/200912/31/200912/31/2009 9:43:37 AM DONE
see final
ELE09-01507 Final12/31/200912/31/200912/31/2009 9:42:53 AMAPASS
ok to final
GCE09-00044 GCE-Rough-In12/30/200912/31/200912/31/2009 9:00:42 AMAFAIL
Contact Zen @###-####Please contact Zen prior to come in for inspection.The applicant wants the inspector to look at electrical Ceiling. called, left correction notice, NEC 362.30(A) ent shall be securely fastened within 3' of box and every 3', 330.30(B) mc cable shall be secured within 12" of boxes, 110.12(A) shall close boxes- install cover,725.25 accessible portions of abandoned cl 2,3, pltc cables shall be removed, 300.11(A) cables and raceways shall not be supported by ceiling grids, no esc this project