Inspections for the day of: Thursday, December 31, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00563 FIR-Aging Inspection12/31/200912/31/20091/7/2010 2:47:21 PM NR
Pending site inspection request for permit final.
FIR09-00286 INSP-Final Inspection12/31/200912/31/200912/31/2009 3:29:10 PMPPASS
Fire sprinkler permit finaled.
FIR09-00282 INSP-Final Inspection12/31/200912/31/200912/31/2009 3:28:51 PMPPASS
Fire sprinkler permit finaled.
FIR09-00285 INSP-Final Inspection12/31/200912/31/200912/31/2009 3:28:35 PMAPASS
Fire sprinkler permit finaled.
FIR09-00284 INSP-Final Inspection12/31/200912/31/200912/31/2009 3:28:19 PMAPASS
Fire sprinkler permit finaled.
FIR09-00283 INSP-Final Inspection12/31/200912/31/200912/31/2009 3:28:01 PMAPASS
Fire sprinkler permit finaled.
FIR09-00706 INSP-Final Inspection12/30/200912/31/200912/31/2009 3:27:28 PMAPART
Correction notice items field verified for completion, fire sprinkler work is approved for ceiling cover at the remodel area per permit documents.
FIR09-00622 INSP-Final Inspection12/29/200912/31/200912/31/2009 3:26:29 PMAFAIL
Flow switches at risers #4 and 5 did not function, outside bell did not operate, provide weatherproof devices at the shower rooms, post a listing of account activity with today's date for signals sent at next inspection, provide record drawings indicating field modifications/address changes etc. Remainder of items tested okay include heat and smoke detectors, nac panels, EOL's, relay for mag locks, notification throughout, risers 1thru 3.
FIR09-00675 INSP-Sprinkler Rough-in12/30/200912/31/200912/31/2009 3:15:53 PMAFAIL
Existing heads outside the new production area wall to the south side are overspaced and were to be relocated per approved drawings, overhead modifications at the "green room" and adjacent control room are not included in the scope of work, noted one pendent sprinkler head at the green room is supplied by a drop with an in-line ball vavle with the handle removed, outside bell failed to operate, flow switches at risers #4 and 5 did not function. Celing cover okayed at the new sifting room and the jenny craig production area.