FIR13-00475
| INSP-Sprinkler Rough-in | 12/31/2013 | 12/31/2013 | 12/31/2013 4:36:24 PM | P | PART |
|
|
|
FIR12-00586
| INSP-Sprinkler Rough-in/Hydro | 12/31/2013 | 12/31/2013 | 12/31/2013 4:33:15 PM | P | PART |
|
|
UG fire supply line passed hydrostatic test 12/30/13.
|
BLD13-03484
| FIRE-Conference | 12/31/2013 | 12/31/2013 | 12/31/2013 4:31:21 PM | P | DONE |
|
|
On site conference with tenant regarding conditions for occupancy including fire extinguishers, exit signs, EM lights, door hardware and project schedule.
|
FIR13-00661
| INSP-Sprinkler Rough-in | 12/30/2013 | 12/31/2013 | 12/31/2013 4:25:04 PM | A | PART |
|
|
Pendent head coverage at the remodel areas basement level completed acceptable- okayed for ceiling cover.
|
FIR13-00699
| INSP-Sprinkler Rough-in/Hydro | 12/30/2013 | 12/31/2013 | 12/31/2013 4:22:19 PM | A | PART |
|
|
Overhead fire sprinkler modifications okayed for cover at the drop ceilings. Need to secure retainer strap at beam clamp in the new single office.
|
FIR12-00730
| INSP-Final Inspection | 12/30/2013 | 12/31/2013 | 12/31/2013 4:19:39 PM | A | PASS |
|
|
Fire sprinkler work passed final inspection and walkthrough.
|
FIR13-00609
| INSP-Sprinkler Rough-in | 12/27/2013 | 12/31/2013 | 12/30/2013 9:34:21 AM | A | CANC |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|