FIR15-00687
| INSP-Sprinkler Rough-in | 12/30/2015 | 12/31/2015 | 12/31/2015 11:36:21 AM | A | PART |
|
|
Phase 2 Rough to cover ok at the following areas and as marked on the job site plans: -Second floor all Phase 2 rooms and corridors EXCEPT Common Rooms -First room all Phase 2 rooms EXCEPT dry sidewall over porches.
Still to be inspected are the first floor corridors, common areas and elevator area
|