ELE19-04582
| Electrical Rough-In | 12/31/2019 | 12/31/2019 | 12/31/2019 2:02:34 PM | P | PASS |
|
|
Above Ceiling inspection. If possible call 30 minuets before so Dan can meet you. Thanks Phone #: ###-#### Inspection requested via web by Brad Hoots Level 2 corridor grid rough in ok cover
|
ELE19-04939
| Rough-In Permanent Service | 12/30/2019 | 12/31/2019 | 12/31/2019 11:19:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews Rough in ok cover p/s o/h n ok
|
ELE19-04752
| Final | 12/30/2019 | 12/31/2019 | 12/31/2019 10:30:00 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman 210.8(B)- All receptacle outlets located with in 6' of a sink shall have GFCI protection. Breakroom. 300.15- All cables shall terminate in a box. above grid just in from door. 314.25- All boxes shall have covers. Above grid just in from door.
|
ELE19-03933
| Electrical Rough-In | 12/31/2019 | 12/31/2019 | 12/31/2019 9:43:27 AM | A | PASS |
|
|
Requesting 9:00 am inspection. Install 1 wall sign Phone #: ###-#### Inspection requested via web by Ken Olsen Listing and disconnecting means confirmed. Rough in ok
|
ELE19-04379
| Final | 12/30/2019 | 12/31/2019 | 12/31/2019 9:03:12 AM | A | PASS |
|
|
Roy-call for access Phone #: ###-#### Final ok
|