ELE19-04788
| Electrical Rough-In | 12/30/2019 | 12/31/2019 | 12/31/2019 1:10:00 PM | P | PASS |
|
|
Please call me for access 30 min prior, I have the key! thx Steve Phone #: ###-#### Inspection requested via web by Steven Meredith ANSUL system rough in only. All surface mount conduit. 20/20 quad breaker needs replaced with 15/15 quad as per nameplate on ANSUL panel. Need to check RTU on final after VFD's have been enrgized.
|
ELE19-00833
| Conference | 12/30/2019 | 12/31/2019 | 12/31/2019 12:34:25 PM | P | PASS |
|
|
Please call me on this also to coordinate for access and hopeful project close out! Phone #: ###-#### Inspection requested via web by Steven Meredith Contractor looking to close permit. Demo only. Will wait till new contractor has pulled a permit for reinstall as there are still lockouts on Electrical room.
|
ELE19-04938
| Electrical Rough-In | 12/30/2019 | 12/31/2019 | 12/31/2019 12:26:23 PM | P | PASS |
|
|
Underground for floor plugs and island Phone #: ###-#### Inspection requested via web by Zane Robertson underground ok to cover
|
ELE19-04901
| Permanent Service | 12/31/2019 | 12/31/2019 | 12/31/2019 11:44:42 AM | P | PASS |
|
|
please reinspect. Fault current calculation is posted inside the front cover of the metering center. Phone #: ###-#### Inspection requested via web by David Mackey Correction made p/s u/g n ok
|
ELE19-04943
| Final | 12/31/2019 | 12/31/2019 | 12/31/2019 11:44:03 AM | P | NR |
|
|
please call brodie @ with any questions ###-####. Replacing pedestal Phone #: ###-#### Inspection requested via web by William Salts Call for final after energized
|
ELE19-04943
| Permanent Service | 12/31/2019 | 12/31/2019 | 12/31/2019 11:26:47 AM | A | PASS |
|
|
please call brodie @ with any questions ###-####. Replacing pedestal Phone #: ###-#### Inspection requested via web by William Salts RV pedistall p/s u/g n ok
|
ELE19-04944
| Electrical Rough-In | 12/31/2019 | 12/31/2019 | 12/31/2019 11:17:42 AM | P | PASS |
|
|
floor heat inspection Phone #: ###-#### Inspection requested via web by Barbara Szurgot Master floor heat ok to cover
|
ELE19-04931
| Final | 12/30/2019 | 12/31/2019 | 12/31/2019 10:23:37 AM | A | PASS |
|
|
Please contact Jason Noble at ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
|
ELE19-04931
| Electrical Rough-In | 12/31/2019 | 12/31/2019 | 12/31/2019 10:23:21 AM | P | PASS |
|
|
Please contact Jason Noble at ###-#### Phone #: ###-#### Inspection requested via web by Deb Gooden All wire fished in. 120v circuit to hot tub ok
|
ELE19-04906
| Electrical Rough-In | 12/30/2019 | 12/31/2019 | 12/31/2019 9:52:35 AM | A | FAIL |
|
|
brian Phone #: ###-#### 240.4D 14awg wire is only good for 15Amps. Adding to 20 Amp circuits. All wire shall be 12awg
|
ELE19-04516
| Electrical Rough-In | 12/30/2019 | 12/31/2019 | 12/31/2019 9:48:34 AM | A | PASS |
|
|
North west Underground to building Phone #: ###-#### Inspection requested via web by Stephanie Huston Underground from main gear to parking garage (running E to W) ok to cover
|