ELE00-00669
| Electrical Rough-In | 12/1/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | A | PART |
|
|
2nd and 3rd floors ###-####. walls ele r/i, ok. 12/4/2000 11:50:37 AM
|
ELE00-00669
| Electrical Rough-In | 12/1/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | A | PART |
|
|
this is a final for the 6th floor ###-####. temporary occupancy only. 12/4/2000 11:51:11 AM
|
ELE00-00669
| Permanent Service | 12/1/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | A | PART |
|
|
p/s on all floors ###-####. 3rd , 4th, and 5th floor service panels. 12/4/2000 11:52:15 AM
|
ELE00-04223
| Final | 12/1/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | A | PASS |
|
|
John ###-####. completed, ok. 12/4/2000 9:24:47 AM
|
ELE98-03567
| Electrical Rough-In | 12/1/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/01/2000 at 13:18:09. Contact: ###-####. 8 parking lot lights; 7 sidewalk lights, (ballard) ele r/i. ok 12/4/2000 10:07:03 AM
|
ELE00-04637
| Rough-In Permanent Service | 12/1/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | A | PASS |
|
|
ALLAN ###-#### R/I & SER. ok 12/4/2000 9:06:46 AM
|
ELE00-02954
| Final | 12/4/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | P | PART |
|
|
4221707 go to front counter and have Craig paged (Albertson). 2nd floor: southeast, ceiling r/i ok. southwest temp.occup.. 12/4/2000 2:25:06 PM
|
ELE00-04571
| Final | 12/4/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | P | FAIL |
|
|
###-####. nec:250-24(A) Exc. no.2; requested conference. called message phone, no answer. corrections posted, 12/4/2000 4:11:08 PM
|
ELE00-04202
| Final | 12/4/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | P | PASS |
|
|
call for access ###-#### Pat. completed, ok 12/4/2000 4:11:34 PM
|
ELE00-00669
| Electrical Rough-In | 12/4/2000 | 12/4/2000 | 12/4/2000 12:00:00 AM | P | PART |
|
|
north fire escape stair tower final ###-####. north stairtower ele r/i. 12/4/2000 2:27:08 PM
|