BLD01-00228
| BLD-Final | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 15:36:43. Contact: ###-####. ok for tranfer of occupants and corridor and double doors to be removed upon evacuation of b phase to complet exit sys.. 12/4/2001 1:53:07 PM
|
BLD00-03649
| BLD-Final | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 15:37:49. Contact: ###-####. need smoke seal and fire stopping above door at bundled cables per listing. 12/4/2001 1:54:15 PM
|
BLD01-02413
| BLD-Foundation | 12/4/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | P | PASS |
|
|
bonding /anchor bolts insp-- pete ###-#### rebar ok/ anchor bolts ok. 12/4/2001 2:43:14 PM
|
BLD01-03094
| BLD-Footing | 12/4/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | P | PASS |
|
|
###-#### ft ok 12/4/2001 3:05:48 PM
|
BLD01-01684
| BLD-Final | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | P | FAIL |
|
|
###-#### call kerry first a-3 panic hardware required/ need fire insp. 12/4/2001 4:16:13 PM
|
MEC01-02968
| Final | 12/3/2001 | 12/4/2001 | 12/3/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 16:22:37. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/03/2001 at 16:53:23.
|