ELE01-02458
| Electrical Rough-In | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/03/2001 at 10:38:17. Contact: ###-####. P/S U/G N Ok 12/4/2001 9:29:44 AM
|
ELE01-04069
| Final | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | A | NR |
|
|
frank-- call 1st before insp work ###-#### no R/I done before cover had conf and required partial drywall removal 12/4/2001 10:35:56 AM
|
ELE01-03797
| Electrical Rough-In | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | A | PART |
|
|
###-#### HP Kitchen area ok 12/4/2001 12:39:52 PM
|
ELE01-04077
| Electrical Rough-In | 12/3/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | A | PASS |
|
|
brandon ###-#### around back
|
ELE01-03632
| Final | 12/4/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 08:01:53. Contact: ###-####. 12/4/2001 3:59:50 PM GFCIs reversed polarity dead receps 12/4/2001 4:00:34 PM
|
ELE01-03346
| Rough-In Permanent Service | 12/4/2001 | 12/4/2001 | 12/4/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/04/2001 at 08:46:28. Contact: .
P/S U/G N Ok 12/4/2001 2:28:42 PM
|