Inspections for the day of: Thursday, December 4, 2003.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00488 INSP-Supply line flush12/3/200312/4/200312/4/2003 12:00:00 AMAPASS
Phil; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes UG hydro and flush okay 12/4/2003 10:28:36 AM
FIR03-00702 INSP-Final Inspection12/3/200312/4/200312/4/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/3/2003 at 12:30:54 PM. Contact: ###-####.
BLD03-02511 FIRE-Conference12/3/200312/4/200312/4/2003 12:00:00 AMAPART
don; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Met with Don and reviewed fire code notes. The alarm panel monitors trouble and alarm only and will require supervisory signal for the sprinkler monitoring; the panel will require a smoke detector above the panel and will need to monitor duct detectors for AHU shutdown; it is unclear if the alarm system is monitoring the 3 story elevator recall for primary and alternate floor 12/4/2003 8:33:30 AM
FIR03-00093 INSP-Sprinkler Rough-in/Hydro12/2/200312/4/200312/4/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/2/2003 at 2:40:52 PM. Contact: ###-####. fourth floor - 1 head on 1inch line in stair as plans show 1.25 inch line; minor modifications around ducts, etc. 12/4/2003 4:04:01 PM
BLD03-01729 FIRE-Final Inspection12/3/200312/4/200312/4/2003 12:00:00 AMPPART
temp occupaqncy approved per Dave Miller for fire/life safety pending fire alarm submittals and testing of new smoke/fire dampers for AHU serving the corridor 12/4/2003 4:18:09 PM
FIR03-00655 INSP-Alarm Testing12/4/200312/4/200312/4/2003 12:00:00 AMPCANC
cell# ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino rescheduled for 12/5 12/4/2003 3:51:29 PM
BLD02-00420 FIRE-Conference12/4/200312/4/200312/4/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/4/2003 at 9:07:36 AM. Contact: ###-####. the GC will sheetrock the electrical room, janitors closet and willsprinkler above the ceiling in the breakroom; told GC to let sprinkler contractor know 12/4/2003 5:14:19 PM
FIR03-00563 INSP-Sprinkler Rough-in/Hydro12/4/200312/4/200312/4/2003 12:00:00 AMPPART
bruce -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie overhead hydro okay; will additional hangers in video store area; will need to inspect the rest of the building 12/4/2003 5:11:37 PM
FIR03-00489 INSP-Sprinkler Rough-in/Hydro12/4/200312/4/200312/4/2003 12:00:00 AMPPART
will need hangers as identified on plans
FIR03-00511 INSP-Sprinkler Rough-in12/4/200312/4/200312/4/2003 12:00:00 AMPFAIL
need resumittals for changes
FIR03-00487 INSP-Final Inspection12/4/200312/4/200312/4/2003 12:00:00 AMPPART
need resubmittals for relays to control 4 smoke/fire dampers