FIR03-00488
| INSP-Supply line flush | 12/3/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | A | PASS |
|
|
Phil; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes UG hydro and flush okay 12/4/2003 10:28:36 AM
|
FIR03-00702
| INSP-Final Inspection | 12/3/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/3/2003 at 12:30:54 PM. Contact: ###-####.
|
BLD03-02511
| FIRE-Conference | 12/3/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | A | PART |
|
|
don; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Met with Don and reviewed fire code notes. The alarm panel monitors trouble and alarm only and will require supervisory signal for the sprinkler monitoring; the panel will require a smoke detector above the panel and will need to monitor duct detectors for AHU shutdown; it is unclear if the alarm system is monitoring the 3 story elevator recall for primary and alternate floor 12/4/2003 8:33:30 AM
|
FIR03-00093
| INSP-Sprinkler Rough-in/Hydro | 12/2/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/2/2003 at 2:40:52 PM. Contact: ###-####. fourth floor - 1 head on 1inch line in stair as plans show 1.25 inch line; minor modifications around ducts, etc. 12/4/2003 4:04:01 PM
|
BLD03-01729
| FIRE-Final Inspection | 12/3/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | PART |
|
|
temp occupaqncy approved per Dave Miller for fire/life safety pending fire alarm submittals and testing of new smoke/fire dampers for AHU serving the corridor 12/4/2003 4:18:09 PM
|
FIR03-00655
| INSP-Alarm Testing | 12/4/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | CANC |
|
|
cell# ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino rescheduled for 12/5 12/4/2003 3:51:29 PM
|
BLD02-00420
| FIRE-Conference | 12/4/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/4/2003 at 9:07:36 AM. Contact: ###-####. the GC will sheetrock the electrical room, janitors closet and willsprinkler above the ceiling in the breakroom; told GC to let sprinkler contractor know 12/4/2003 5:14:19 PM
|
FIR03-00563
| INSP-Sprinkler Rough-in/Hydro | 12/4/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | PART |
|
|
bruce -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie overhead hydro okay; will additional hangers in video store area; will need to inspect the rest of the building 12/4/2003 5:11:37 PM
|
FIR03-00489
| INSP-Sprinkler Rough-in/Hydro | 12/4/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | PART |
|
|
will need hangers as identified on plans
|
FIR03-00511
| INSP-Sprinkler Rough-in | 12/4/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | FAIL |
|
|
need resumittals for changes
|
FIR03-00487
| INSP-Final Inspection | 12/4/2003 | 12/4/2003 | 12/4/2003 12:00:00 AM | P | PART |
|
|
need resubmittals for relays to control 4 smoke/fire dampers
|