FIR07-01031
| INSP-Sprinkler Rough-in | 12/4/2008 | 12/4/2008 | 12/4/2008 4:37:22 PM | P | PASS |
|
|
See the as-built plans for the second floor room that is ok to cover the piping.
|
FIR08-00500
| INSP-Sprinkler Rough-in | 12/3/2008 | 12/4/2008 | 12/4/2008 4:36:02 PM | P | PASS |
|
|
See the city approved plans for the deficiencies that have been corrected on the first and second floors. I pointed out to Charles that the FDC is possibly located too close to the roof rain gutter and side of the building.
|
BLD08-01168
| FIRE-Final Inspection | 12/3/2008 | 12/4/2008 | 12/4/2008 4:32:31 PM | P | CANC |
|
|
Not ready for a life safety final
|
BLD08-00560
| FIRE-Final Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 3:42:27 PM | P | PASS |
|
|
fire life safety passed
|
BLD08-02480
| FIRE-Final Inspection | 12/4/2008 | 12/4/2008 | 12/4/2008 2:39:07 PM | P | PASS |
|
|
Life safety passed.
|
BLD08-02282
| FIRE-Final Inspection | 12/3/2008 | 12/4/2008 | 12/4/2008 11:41:49 AM | A | FAIL |
|
|
Provide sprinkler protection for the two offices and the coolers, remove the thumbturn deadbolt from the west exit, remove the deadbolt and provide lever hardware on the southeast exit door and tag and mount the fire extinguishers.
|
BLD08-00890
| FIRE-Final Inspection | 12/2/2008 | 12/4/2008 | 12/4/2008 11:23:03 AM | A | PASS |
|
|
Life safety passed
|
FIR08-00602
| INSP-Final Inspection | 12/3/2008 | 12/4/2008 | 12/4/2008 11:22:34 AM | A | FAIL |
|
|
Provide test reports, get decision from sam rogers on the "future expansion" on the second floor (no notification is functional), and provide modifications as required due to the strobes being blocked on the first floor due to shelving.
|