Inspections for the day of: Thursday, December 4, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00736 BLD-Final12/4/200812/4/200812/4/2008 4:56:23 PMPNR
judy Note: please call 1/2 hr prior to inspection Phone #: ###-####. Still needs zoning, public works and life/safety.
BLD08-02169 BLD-Conference12/3/200812/4/200812/4/2008 4:02:45 PMAFAIL
Provide additional drawings and details for additional duct openings in firewall and show that openings including new fire door do not exceed 25%. Also provide UL listing and detailsfor thru penetrations. Also provide details on how openings are to be protected. Provide UL listing and details for jamb installation on fire door. Fire door is not in line with 2hr. fire wall, provide detail showing fire door in line with firewall or for continuation of jamb protection. Also provide details for code compliant stairway to mezz. Also noted that mezz may be used as breakroom, this is not shown on approved plans. If so, provide aditional details showing code compliant mezz and exiting. Also need to provide calcs to see if in place floor framing will support floor loads for breakroom or storage as is anticipated. Plans must be submitted to pland review for approval before any further work in these areas can proceed.
BLD08-02169 BLD-Conference12/4/200812/4/200812/4/2008 3:50:53 PMACANC
Meeting with contractor, architect and overhead door installer at 10:00am.
BLD08-02329 BLD-Final12/4/200812/4/200812/4/2008 3:30:18 PMPCANC
kirk Phone #: ###-####
BLD08-02329 BLD-Framing/Rough-in12/4/200812/4/200812/4/2008 3:30:12 PMPPASS
kirk Phone #: ###-####
BLD08-00399 BLD-Final12/4/200812/4/200812/4/2008 2:53:15 PMPNR
john Phone #: ###-####
ESC08-00141 Random Inspection12/4/200812/4/200812/4/2008 2:52:51 PMPPASS
ESC08-00843 Site Preparation12/4/200812/4/200812/4/2008 1:52:17 PMPPASS
BLD08-02123 BLD-Footing12/3/200812/4/200812/4/2008 1:52:01 PMPPASS
Scheduled by a contractor via Hello! on 12/3/2008 at 3:16:24 PM. Contact: ###-####.