Inspections for the day of: Thursday, December 4, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00786 Aging Inspection12/4/200812/4/200812/10/2008 3:34:44 PM DONE
ESC06-00782 Aging Inspection12/4/200812/4/200812/4/2008 4:21:33 PM DONE
ESC06-00782 Site Final12/4/200812/4/200812/4/2008 4:21:17 PMPPASS
ESC06-00781 Aging Inspection12/4/200812/4/200812/4/2008 4:16:41 PM DONE
ESC06-00781 Site Final12/4/200812/4/200812/4/2008 4:16:23 PMPPASS
ESC08-00830 Random Inspection12/4/200812/4/200812/4/2008 2:23:01 PMPDONE
Left a message with RP to contact me over if the project is complete and to go over the requirments to pass for a site final.
ESC08-00629 Random Inspection12/4/200812/4/200812/4/2008 1:57:29 PMPPASS
ESC08-00748 Tracking Control12/4/200812/4/200812/4/2008 1:56:19 PMPFAIL
Spoke with the grader about cleaning up all sediment off of the hard surfaces by the end of the day. He told that he will have it done.
ESC08-00617 General Inspection12/1/200812/4/200812/4/2008 11:59:03 AMAFAIL
Correction Notice: (left message with RP)
1. Clean up all sediment debris off of all hard surfaces.
2. Install erosion and/or sediment protect along the slope at the sidewalks.
3. Extend sediment bmp's at the bottom of the hill slope to south.
Failure to comply will result in a Stop Work Order. Will re-inspect onon 12/8/008 AM.
ESC06-00783 Aging Inspection12/4/200812/4/200812/4/2008 9:36:55 AM DONE
ESC06-00783 Site Final12/4/200812/4/200812/4/2008 9:36:51 AMAPASS
ESC08-00491 Tracking Control11/25/200812/4/200812/4/2008 8:57:38 AMADONE
Went over tracking issues with the RP. Told him his options with the EVA out into the court. He will be putting a gate with a lock. Also told him he needs to clean up tracking out on the main strip of road of the entrance. He will be using his water trucks with the PT sprayers to blast all sediment into the burrow ditch on the south side of the road.