ESC09-00415
| BMP Violation | 12/1/2009 | 12/4/2009 | 12/4/2009 3:22:42 PM | P | PART |
|
|
Verbal RP: Re-install sediment barrier per manufatures specs. Will re-inspect on 12/7/09PM.
|
ESC07-01486
| General Inspection | 12/3/2009 | 12/4/2009 | 12/4/2009 2:59:47 PM | A | CANC |
|
|
|
ESC09-00286
| Random Inspection | 12/4/2009 | 12/4/2009 | 12/4/2009 2:59:16 PM | P | PASS |
|
|
Appling a tachifier mulch mixture. Will be mostly completed with all areas be the end of today.
|
ESC08-00629
| General Inspection | 12/4/2009 | 12/4/2009 | 12/4/2009 1:35:55 PM | | DONE |
|
|
Slope partaily vegitative. No potential issues visable.
|
ESC09-00759
| Site Preparation | 12/4/2009 | 12/4/2009 | 12/4/2009 1:27:05 PM | | PART |
|
|
Verbal to RP: Post ESC sign where visiable from the street.
|
ESC09-00544
| BMP Violation | 12/2/2009 | 12/4/2009 | 12/4/2009 1:12:07 PM | A | PART |
|
|
Will be sweeping up the rest of the hard surfaces that have ot been completed. Also activily using water to surpress dust.
|
ESC09-00507
| General Inspection | 12/3/2009 | 12/4/2009 | 12/4/2009 10:55:16 AM | A | FAIL |
|
|
Verbal to Foreman Justin: 1. Along the slope where disturbed behind the stone placement, we are requiring a sediment barrier. 2. After 30ft of driveway is completed install check across the road spacing about every 30ft to the top of driveway where is disturbed. Will re-inspect on 12/7/09AM
|