Inspections for the day of: Tuesday, December 4, 2012.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00247 INSP-Sprinkler Rough-in12/4/201212/4/201212/4/2012 3:44:06 PMPPASS
flush for bldgs 5, 6 & 7 - passed inspection
BLD12-03059 FIRE-Final Inspection12/4/201212/4/201212/4/2012 3:03:03 PMPPASS
life safety passed
FIR12-00483 INSP-Sprinkler Rough-in/Hydro12/3/201212/4/201212/4/2012 2:40:58 PMAPASS
Hydro test passed. See the city approved as-builts for additional areas marked "ok" where the sprinkler piping is ok to cover.
BLD12-02995 FIRE-Conference12/4/201212/4/201212/4/2012 2:07:07 PMPDONE
I met with the owner to discuss door hardware at the main exit. I agreed to not require the lever type hardware at this door the existing hardware being existing and single action. However the thumbturn dead bolt does have to be removed. The keyed hardware is ok.
BLD12-01461 FIRE-Conference12/3/201212/4/201212/4/2012 11:05:48 AMADONE
Dave Dixon wanted to know where to locate the knox key box. I deferred him to the fire dept. for locating the box.
BLD12-03059 FIRE-Final Inspection12/3/201212/4/201212/4/2012 11:04:41 AMAFAIL
The emergency light at the rear retail area and the exit sign/emergency light located at the back door still do not work.
FIR12-00638 INSP-Sprinkler Rough-in12/3/201212/4/201212/4/2012 9:04:11 AMAFAIL
This is a tenting inspection. The General Contractor is the contact. David Paul. Thanks Phone #: ###-####.

I left voice message for contact stating I was on the way to the project. I found some of the tenting repaired but other areas I found where the plastic tenting can easily be moved and is not secured. Also one vertical riser appears to need batt insulation to protect it if it extends above the blow-in insulation when installed. Piping still can not be covered.