ESC13-00679
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 5:04:48 PM | | PASS |
|
|
Finaled. See activity notes.
|
ESC13-00679
| DOC - Permit Finaled | 12/4/2013 | 12/4/2013 | 12/4/2013 5:04:25 PM | P | PASS |
|
|
Sculpture has been installed and project is complete. Surrounding area has been permanently stabilized with bricks/pavers for entrance into the Grove. ESC conditions satisfied.
|
ESC13-00791
| Tracking Control | 12/4/2013 | 12/4/2013 | 12/4/2013 3:27:48 PM | P | FAIL |
|
|
Verbal correction issued to RP John via phone.
1. Sweep/clean up track out from project onto the sidewalk and street. 2. Replenish/maintain construction entrance to prevent further track out.
Corrections due before end of week 12/6/13
|
ESC13-00232
| Tracking Control | 12/4/2013 | 12/4/2013 | 12/4/2013 3:23:33 PM | P | PASS |
|
|
RP has completed requested corrections from 11/29. Roadway was swept and unauthorized entrance was blocked by a sign and barricade. Visual confirmation and follow-up call from RP
|
ESC13-00584
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 3:14:33 PM | | PASS |
|
|
Permit posted, no track out - construction entrance is effective. Putting in fence in between lot and canal access road. No corrections required at this time.
|
ESC13-00729
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 3:13:19 PM | | PASS |
|
|
Stabilization by means of vegetation and landscaping in progress. Some pool house work remains. No violations observed at time of inspection.
|
ESC13-00570
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 2:14:21 PM | | PASS |
|
|
No activity at time of inspection. Permit posted. No violations observed.
|
ESC13-01037
| Site Preparation | 12/3/2013 | 12/4/2013 | 12/4/2013 10:50:51 AM | A | PASS |
|
|
|
ESC13-00260
| Aging Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 10:43:40 AM | | PASS |
|
|
Finaled. See activity notes for details.
|
ESC13-00260
| DOC - Permit Finaled | 12/4/2013 | 12/4/2013 | 12/4/2013 10:28:43 AM | P | PASS |
|
|
House complete, landscaped, and occupied. Permits finaled. ESC conditions have been met.
|
ESC13-00738
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 10:11:19 AM | | PASS |
|
|
|
ESC13-00339
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 9:33:55 AM | | PASS |
|
|
This ESC permit is attached to BLD permit for site development, grading, and drainage structures, which has not been finaled.. A seperate BLD13-00888 for the vertical construction has been finaled.
No violations at time of inspection, but rear portion of parking lot/delivery is not complete. Storm drain DI bags have already been removed.
|
ESC13-00269
| Conference | 12/3/2013 | 12/4/2013 | 12/4/2013 9:17:58 AM | A | DONE |
|
|
To discuss stabilization of a swale.Contact is Gregg with HC Company. ###-####.
Confirmed that sides of drainage swale (sandy medium) will be stabilized with hydroseed. Geotextile blanket will be placed under rip-rap on swale inlet.
Surrounding area property to the north and west of development stabilization to be discussed prior to final.
|
ESC13-00676
| General Inspection | 12/4/2013 | 12/4/2013 | 12/4/2013 8:42:07 AM | | PASS |
|
|
Finaled. See activity notes.
|
ESC13-00676
| DOC - Permit Finaled | 12/4/2013 | 12/4/2013 | 12/4/2013 8:41:36 AM | P | PASS |
|
|
Patio and trellis are complete and surrounding area stabilized, BMP removed from stormwater DIs. Permit still posted, BLD pending P&Z. ESC permit conditions satisfied.
|